100% Verified Answers |Actual Complete Exam| Already
Graded A+
1. Whose responsibility is it to review past
Contracting Oflcer (KO)
performance during the Pre-Award phase?
2. is the Preferred method because it puts the Performance
Work State- risk on the contractor and has measurable metrics and
ment (PWS). milestones which incentivize a contractor.
3. What might cause restrictive language in a Lack of flexibility and
require- ments document? com- petition
(ambiguity)
4. are detailed descriptions telling the
con- tractor what to do and how to do it. Statement of Work
5. Type of requirement might be listed on a DA 3953• • A description of
what is to
be acquired
• Fund citation
• Required delivery
dates
• Delivery or
performance location
• Requiring activity
point of contact
6. What document describes the required supplies or ser- Purchase
Request
vices so procurement can be initiated?
7. Types of requirement documents and the 1. Documents
order of precedence? mandated for use by
law. (Market re-
search)
2. Performance-
, AATC CON 1200 Exam 1 Study Guide with all Correct &
100% Verified Answers |Actual Complete Exam| Already
Graded
oriented A+
documents.
(e.g., a PWS or SOO).
,AATC CON 1200 Exam 1 Study Guide with all Correct &
100% Verified Answers |Actual Complete Exam| Already
Graded A+ (3) Detailed
design-ori- ented
documents.
(4) Standards,
specifica- tions and
related publica- tions
issued by the Gov-
ernment outside the
De- fense or Federal
series for the non-
repetitive acquisi- tion
of items.
8. Funding restriction is if funds are not obligated
Time during their period of availability, they
expire and are unavailable for new obligations.
9. Funding restriction is when funds must be Purpose
ex- pended for the purpose established by
Congress.
Amount
10. Funding restriction is the Anti-Deficiency
Act prohibits obligating or spending money
before it is appropriated or in amounts in
excess of the amount appropriated.
11. What are the 3 types of specification? 1. Design Specification
2. Functional
Specifica- tions
3. Performance
Specifica- tions
12. Specification Identify requirements
, AATC CON 1200 Exam 1 Study Guide with all Correct &
100% Verified Answers |Actual Complete Exam| Already
Graded A+
by specifying exact dimensions, materials, Design
composi- tion, physical and chemical
requirements and other details of the product
or service.