Which of the following would be considered a primecontractor? - 🧠
ANSWER ✔✔D. A contractor with whom the project owner has established
a contract.
Which of the following correctly identifies what is included in legitimate
labor costs? - 🧠 ANSWER ✔✔D. Hourly wages, fridge benefit packages,
payroll taxes insurance and safety costs, and small tools and consumables
Which in the following best illustrates the PRIMARY role of a foreman? - 🧠
ANSWER ✔✔B. To Effectively manage and lead the crew
As a foreman what should ALWAYS be your FIRST priority when planning
a job? - 🧠 ANSWER ✔✔D. Keeping the crew actively engaged in
completing their work
,As a foreman what should ALWAYS be your FIRST priority when planning
of a project? - 🧠 ANSWER ✔✔B. Developing a job strategy before the job
begins
Which of the following describe the purpose of Short Interval Planning or
Look ahead planning? - 🧠 ANSWER ✔✔A. Breaking the job into small
manageable pieces
Which of the following is the FIRST thing a foreman must do before
beginning to plan a job? - 🧠 ANSWER ✔✔A. Read all the project-related
documents
Which of the following provides the BEST example of prefabrication? - 🧠
ANSWER ✔✔A. To Create a product in the shop and install it in the field
Which of the following is NOT required on a daily log? - 🧠 ANSWER ✔✔C.
The work completed by the individual crew members
Which of the following is NOT likely to lead to improved material handling?
- 🧠 ANSWER ✔✔D. Have all the materials and equipment delivered at the
beginning of the job
, Which of the following purchasing procedures is MOST likely to reduce
material handling time? - 🧠 ANSWER ✔✔A. Bag and Tag all materials as
appropriate
What should a foreman do if damage to he/she is discovered AFTER the
delivery driver has left the job site? - 🧠 ANSWER ✔✔C. Notify the Project
manager and note the damage on the daily log.
Which of the following location represents the BEST place to store job site
materials in a manner that enhance says productivity? - 🧠 ANSWER ✔✔D.
As close to the point of installation as possible
With which of the following costs should a foreman be MOST concerned? -
🧠 ANSWER ✔✔A. Labor
Which of the following is NOT considered a DIRECT job cost? - 🧠
ANSWER ✔✔D. Home office overhead
An ______ occurs when any condition or document modifies the work as
defined in the contract during the BIDDING process - 🧠 ANSWER ✔✔B.
Addendum
Where can the requirements for "Job Close Out" be found? - 🧠 ANSWER
✔✔B. Within the contract documents.