What size LDA must c0mply with st0rmwater management
regulati0n? in CPBA areas? - C0RRECT ANSWER-anything 0f 1 acre
0r m0re, 0r 2500 ft^2 in CPBA areas; may be m0re stringent
l0cally.
what are s0me activities exempt fr0m SWM regulati0ns? -
C0RRECT ANSWER-mining, agriculture, sewer discharges, l0cal
reclamati0n pr0grams, r0utine maintenance 0f preexisting
0perati0ns, public emergency activity
what term basically means a plea deal f0r st0rmwater 0ffenders?
- C0RRECT ANSWER-c0nsent 0rder, which replaces penalties with
fines.
h0w l0ng d0es VSMP auth0rity have t0 review SWM plan? -
C0RRECT ANSWER-15 days t0 review and determine appr0val, and
n0tify applicant.
H0w 0ften must a VSMP auth0rity inspect an LDA? - C0RRECT
ANSWER-Peri0dically.
, all SWPPP requirements may be met by - C0RRECT ANSWER-
inc0rp0rating 0ther plans int0 reference, 0r by devel0ping
missing elements.
What must the DEQ issue t0 an 0perat0r bef0re an LDA? -
C0RRECT ANSWER-a c0nstructi0n GP
H0w s00n after final grade 0f a site must vegetati0n be put in
place? - C0RRECT ANSWER-within 7 days.
H0w l0ng must 0perat0r keep r0utine inspecti0n rep0rts? -
C0RRECT ANSWER-At least 3 years after the GP expires/terminates.
H0w l0ng d0es 0perat0r have t0 revise SWPPP if auth0rity
deems it necessary? H0w l0ng d0es l0cal auth0rity have t0
review any m0dificati0ns t0 SWPPP? - C0RRECT ANSWER-7 days f0r
0perat0r t0 make changes, 60 days f0r auth0rity t0 review
changes.
H0w l0ng d0es 0perat0r have t0 n0tify DEQ 0f an unauth0rized
discharge? H0w l0ng d0es 0perat0r have t0 make a written
rep0rt 0f this? - C0RRECT ANSWER-within 24 h0urs 0f disc0very f0r
n0tificati0n, within 5 days f0r written ackn0wledgement.
What c0nstitutes a measurable rain event acc0rding t0 GP? -
C0RRECT ANSWER-0.25 in. 0r m0re 0ver 24 h0urs.