CIT 345 Ch 9
1. The process of creating an information system is known as develop-
ment: systems
2. The traditional Systems Development Life Cycle (SDLC) is divided into
phases: five
3. What is the primary objective of database design?: To create complete, normalized, and
nonredundant database models
4. "Should the existing system be replaced?" is a question that is asked during
the stage of the Systems Development Life Cycle (SDLC): planning
5. The initial assessment and feasibility study are part of the SDLC's
phase: planning
6. The phase of the SDLC should result in a better understanding of
1/4
, functional areas, actual and potential problems, and opportunities of the cur-
rent system: analysis
7. The must specify the appropriate conceptual data model, inputs,
processes, and expected output requirements: logical design
8. Coding, testing, and debugging of a system are part of the phase of
the Systems Development Life Cycle (SDLC): implementation
9. The phase of database development includes creating a database
storage structure, loading data into a database, and providing for data man-
agement: implementation
10. is generally composed of a graphical representation as well as tex-
tual descriptions of the main data elements, relationships, and constraints: Con-
2/4
1. The process of creating an information system is known as develop-
ment: systems
2. The traditional Systems Development Life Cycle (SDLC) is divided into
phases: five
3. What is the primary objective of database design?: To create complete, normalized, and
nonredundant database models
4. "Should the existing system be replaced?" is a question that is asked during
the stage of the Systems Development Life Cycle (SDLC): planning
5. The initial assessment and feasibility study are part of the SDLC's
phase: planning
6. The phase of the SDLC should result in a better understanding of
1/4
, functional areas, actual and potential problems, and opportunities of the cur-
rent system: analysis
7. The must specify the appropriate conceptual data model, inputs,
processes, and expected output requirements: logical design
8. Coding, testing, and debugging of a system are part of the phase of
the Systems Development Life Cycle (SDLC): implementation
9. The phase of database development includes creating a database
storage structure, loading data into a database, and providing for data man-
agement: implementation
10. is generally composed of a graphical representation as well as tex-
tual descriptions of the main data elements, relationships, and constraints: Con-
2/4