100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

Florida Building Code – Building 2025 Practice Test with 250 Recently Tested Questions and Correct Answers / FL Building Code Exam Prep Qs and Correct As

Rating
-
Sold
-
Pages
115
Grade
A+
Uploaded on
03-11-2025
Written in
2025/2026

Ace your Florida Building Code exam with this comprehensive 2025 practice test featuring 250 recently tested questions and verified correct answers. This essential exam prep tool covers all key areas, including permits, inspections, occupancy classifications, fire resistance ratings, structural requirements, means of egress, roofing, and wind loads. Each question includes the correct answer and a reference to the relevant code section for efficient study. Ideal for building contractors, inspectors, architects, and anyone preparing for the Florida Building Official or Building Code Administrator license exams. Key Features: 250 Practice Questions: Covers a wide range of topics directly from the Florida Building Code. Verified Correct Answers: Includes accurate solutions to check your knowledge. Code References: Many answers cite specific FBC sections for deeper understanding. Recent & Relevant: Based on recently tested material for the 2025 code cycle. Perfect for Exam Prep: Build confidence and identify areas for further study.

Show more Read less
Institution
Florida Building Code – Building
Course
Florida Building Code – Building











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Florida Building Code – Building
Course
Florida Building Code – Building

Document information

Uploaded on
November 3, 2025
Number of pages
115
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • florida buildin

Content preview

1|Page



Florida Building Code – Building 2025
Practice Test with 250 Recently Tested
Questions and Correct Answers / FL Building
Code Exam Prep Qs and Correct As

All of the following require local building permits except a
project:

A. On federal or state owned property

B. Contracted for less than $2,500

C. Being done by the property owner personally

D. That does not affect public health or safety p




..........ANSWER.......A. On federal or state owned property



Who has jurisdiction over the inspection of amusement
rides?

A. Building Department

B. Department of Agriculture and Consumer Services

C. Department of Financial Services

,2|Page


D. Department of Game and Commission p




..........ANSWER.......B. Department Agriculture and Consumer
Services



All of the following operations can be performed without
obtaining a permit except:

A. Replace a load management control device

B. Install a portable cooling unit

C. Install a self contained refrigeration system containing 18
p




pounds of refrigerant and actuated by a 1.75 hp motor

D. Replace chilled water piping within existing cooling
equipment ..........ANSWER.......C. Install a self contained
p p




refrigeration system containing 18 pounds of refrigerant and
actuated by a 1.75 hp motor



According to the Florida Building Code, when repairs must
be performed in an emergency situation, the permit

,3|Page


application shall be submitted within ___________ to the
building official.

A. 5 days from completion

B. The next working day

C. 5 days from commencement

D. 7 days from commencement ..........ANSWER.......B. The next
p




working day



Who shall examine, or cause to be examined, applications for
permit?

A. Building official

B. Building department

C. Architect

D. Contractor ..........ANSWER.......A. Building Official
p




An application for a permit for any proposed work, shall be
deemed to have been abandoned ________ after the date of

, 4|Page


filing for the permit, unless before then, a permit has been
issued.

A. 90 days

B. 120 days

C. 180 days

D. 1 year ..........ANSWER.......C. 180 days
p




According to Florida Building Code, if no time extension is
granted, how long does the contractor have to start
construction before the permit expires?

A. 60 days

B. 90 days

C. 180 days

D. 365 days ..........ANSWER.......C. 180 days
p

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Verifiedtestbanks Chamberlain College Of Nursng
View profile
Follow You need to be logged in order to follow users or courses
Sold
237
Member since
2 year
Number of followers
61
Documents
4463
Last sold
3 days ago
TEST BANKS AND ALL KINDS OF EXAMS SOLUTIONS

TESTBANKS, SOLUTION MANUALS & ALL EXAMS SHOP!!!! TOP 5_star RATED page offering the very best of study materials that guarantee Success in your studies. Latest, Top rated & Verified; Testbanks, Solution manuals & Exam Materials. You get value for your money, Satisfaction and best customer service!!! Buy without Doubt..

4.9

1032 reviews

5
926
4
71
3
24
2
9
1
2

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions