CEPSCI (CERTIFIED EROSION PREVENTION AND
SEDIMENT CONTROL INSPECTOR) ACTUAL EXAM
WITH 100% VERIFIED QUESTIONS & CORRECT
ANSWERS |GUARANTEED SUCCESS
1972 clean water act - Correct-answer-Administered by the US
environmental protection agency (EPA) Created the NPDES
1987 - Correct-answer-Amendment to CWA CALLED WATER QUALITY
ACT
NPDES in south carolina - Correct-answer-South Carolina is NPDES
delegated state.
NPDES regulations are administered by - Correct-answer-SCDHEC
,2|Page
CGP authorizes - Correct-answer-stormwater discharges from
construction sites
Who must obtain NPDES coverage - Correct-answer-land disturbing
activities greater than or equal to 1 acre
-land disturbance less than 1 ac within 1/2 miles of water body in SC
costal zone
NPDES permits are issued to - Correct-answer-operator-person or
company for a particular discharge
primary permittee - Correct-answer--has day to day operational control
to ensure compliance with SWPP
-typically the owner or developer
primary permittee responsibilites - Correct-answer-submit NOI,
Preparation of the C_SWPPP
, 3|Page
Secondary permittee - Correct-answer-individual lot owner or
residential builder that conducts land disturbing activity limited to an
individual lot or group of lots as part of approved LCP of development
contractors - Correct-answer-must on Contractor Certification- D-0437
On-Site SWPPP - Correct-answer-SCDHEC CGP, NOI, NPDES coverage
approval letter, Contractor Certifications, Local Approvals, USACE
approvals, Critical area permit(coast)
OS_SWPPP - Correct-answer-a copy of signed and certified SWPPP,
NOI, and CGP coverage letter from DHEC must be retained at site or
electronically accessible
minor modification to ON-SWPPP - Correct-answer-minor modifications
made directly in the field,do not need approval by DHEC- additional
BMP's, removal of disturbed areas