100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Other

ingevulde oefening 11

Rating
-
Sold
1
Pages
26
Uploaded on
20-01-2021
Written in
2020/2021

Dit is de ingevulde oefeningen van les 11

Institution
Course










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Study
Course

Document information

Uploaded on
January 20, 2021
Number of pages
26
Written in
2020/2021
Type
Other
Person
Unknown

Subjects

Content preview

Takt Time Calculation

A company of engines works 5 days a week with 3 shifts a day. Every shift is of 480
minutes. The break for lunch is 30 minutes. In that period of 13 weeks the customer's
request is 4768 engines.
Calculate the Takt Time in the period.




request 4768 engines

weeks 13
weekdays 5
break 30 minutes
workday 480 minutes
shifts 3 per day
Manufacturing time 184 minutes

Worktime available 87750 minutes

Takt time 18.40 minutes / engine

, 80
omer's

, Takt time - multiple items problem 1
A company of engines works every day with 2 shifts a day. Every shift is of 8 h .
3 products are manufactured, with different demands.

Adapt the Takt Time calculation to allow producing all these products together in package runs
(= combined runs of all products together).


1) Calculate available labour time
• Time per shift 8h
• 2 shifts
• available labour time: 8 x 2 = 16 h
available labour time: 480’ x 2 = 960

2) Customer Demand : 20 days per month
Demand / month Demand / day
A 12000 600
B 4000 200
C 4000 200
Total 20000 1000


3) Calculate cycle time per product as if it received all available labour time

Item day production cycle time (in min)
A 600 1.6
B 200 4.8
C 200 4.8

4) Determine Least Common Multiple
LCM 4.8



5 ) Determine content of 1 package or sequence
Item cycle time (in min) # l items a serie

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
maeslouisleo Hogeschool Gent
Follow You need to be logged in order to follow users or courses
Sold
24
Member since
4 year
Number of followers
14
Documents
17
Last sold
2 year ago
Samenvattingen

Hier vind je volledige samenvattingen voor de richting KMO management

2.0

1 reviews

5
0
4
0
3
0
2
1
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions