When should an architect submit drawings to the proper planning and permitting
c c c c c c c c c c c
authority to begin the approval process? - answer-After DD phase once a set of
c c c c c c c c c c c c c c
drawings has been prepared specifically for permitting purposes
c c c c c c c c
SW - answer-Most durable brick and acceptable for use when exposed to freeze-thaw
c c c c c c c c c c c c
cycles when wet or when bricks are in contact with ground
c c c c c c c c c c c
MW or MX - answer-Brick is acceptable where it will not be exposed to freeze-thaw
c c c c c c c c c c c c c c
cycles when wet. Lower compressive strength than SW brick
c c c c c c c c c
NW or NX - answer-Brick that acceptable when it will never be exposed to color or damp
c c c c c c c c c c c c c c c c
conditions such as when used indoors
c c c c c c
FBS - answer-brick for general use in masonry
c c c c c c c
FBX - answer-brick for general use in masonry where requirements call for a higher
c c c c c c c c c c c c c
degree of precision and low or permissible variation in size than permitted for FBS
c c c c c c c c c c c c c c
FBA - answer-Brick for general use in masonry selected to produce characteristics
c c c c c c c c c c c
architectural effects resulting from nonuniformity in size and texture of the individual
c c c c c c c c c c c c
units
c
A701 - answer-Addenda will be issued no later than four days prior to the date for receipt
c c c c c c c c c c c c c c c c
of Bids except an addendum with drawing the request for bids or one which includes
c c c c c c c c c c c c c c c
postponement of the date for receipt of bids
c c c c c c c c
During the bidding period for a new sports complex, the architect receives a request for
c c c c c c c c c c c c c c
information from one of the bidding contractors. The architect determines that the
c c c c c c c c c c c c
construction documents need to be revised.
c c c c c c
According to the A701-2018 Instructions to Bidders document, what should the architect
c c c c c c c c c c c
do in addition to revising the drawings? - answer-Issue an addendum
c c c c c c c c c c c
A homeowner wishes to have a three-hole practice golf course on their property. The
c c c c c c c c c c c c c
site design requires drainage to promote healthy soil and plant life.
c c c c c c c c c c c
Which type of site drainage system should the architect suggest? - answer-Swale
c c c c c c c c c c c
, Swale - answer-Shallow linear depressions that are designed into a sites surface in
c c c c c c c c c c c c
order to carry away storm water. They have no shoulders and are god for designs that
c c c c c c c c c c c c c c c c
require a seamless integration into a landscape
c c c c c c c
Terracing - answer-reduces soil erosion c c c c
Underdrainage - answer-Unless it is required, this wouldn't be used because it is
c c c c c c c c c c c c
expensive and prone to failure if not done right. A percolation test can determine if it is
c c c c c c c c c c c c c c c c c
needed. An example is a perforated drain tile
c c c c c c c c
Drainage Channel - answer-For carrying heavier amounts of rainfall, perhaps from a
c c c c c c c c c c c
collection of swales or other channels. It is deeper than a swale and has distinctive
c c c c c c c c c c c c c c c
shoulders.
c
Due to excessive groundwater, the architect has specified a perimeter drain around the
c c c c c c c c c c c c
building foundation.
c c
To which of the following could this drain pipe flow? - answer-Daylight, Sump Pump,
c c c c c c c c c c c c c
Storm Sewer System
c c c
Sump Pump - answer-Electric pump used to remove water from a basement or any
c c c c c c c c c c c c c
collection pit.
c c
A mechanical engineer is designing the HVAC system for a library. The system must be
c c c c c c c c c c c c c c
quiet and highly efficient for the comfort of the patrons and to provide necessary
c c c c c c c c c c c c c c
humidity levels to protect the books.
c c c c c c
Which of the following duct cross-sectional configurations should be specified? - answer-
c c c c c c c c c c c
Circular - no corners and less surface area for the same cross-sectional area so it has
c c c c c c c c c c c c c c c
less friction
c c
left hand reverse - answer-hinges on left, swinging out of room
c c c c c c c c c c
left hand - answer-hinges on left, swinging into room
c c c c c c c c
Right hand reverse - answer-hinges on right, swinging out of room
c c c c c c c c c c
right hand - answer-hinges on right, swinging into room
c c c c c c c c
Wood Embodied Energy - answer-185
c c c c
Sand and Gravel Embodied Energy - answer-18
c c c c c c
Lightweight Concrete Embodied Energy - answer-940 c c c c c
Gypsum Board Embodied Energy - answer-1830
c c c c c
Brickwork Embodied Energy - answer-2200 c c c c
solutions
When should an architect submit drawings to the proper planning and permitting
c c c c c c c c c c c
authority to begin the approval process? - answer-After DD phase once a set of
c c c c c c c c c c c c c c
drawings has been prepared specifically for permitting purposes
c c c c c c c c
SW - answer-Most durable brick and acceptable for use when exposed to freeze-thaw
c c c c c c c c c c c c
cycles when wet or when bricks are in contact with ground
c c c c c c c c c c c
MW or MX - answer-Brick is acceptable where it will not be exposed to freeze-thaw
c c c c c c c c c c c c c c
cycles when wet. Lower compressive strength than SW brick
c c c c c c c c c
NW or NX - answer-Brick that acceptable when it will never be exposed to color or damp
c c c c c c c c c c c c c c c c
conditions such as when used indoors
c c c c c c
FBS - answer-brick for general use in masonry
c c c c c c c
FBX - answer-brick for general use in masonry where requirements call for a higher
c c c c c c c c c c c c c
degree of precision and low or permissible variation in size than permitted for FBS
c c c c c c c c c c c c c c
FBA - answer-Brick for general use in masonry selected to produce characteristics
c c c c c c c c c c c
architectural effects resulting from nonuniformity in size and texture of the individual
c c c c c c c c c c c c
units
c
A701 - answer-Addenda will be issued no later than four days prior to the date for receipt
c c c c c c c c c c c c c c c c
of Bids except an addendum with drawing the request for bids or one which includes
c c c c c c c c c c c c c c c
postponement of the date for receipt of bids
c c c c c c c c
During the bidding period for a new sports complex, the architect receives a request for
c c c c c c c c c c c c c c
information from one of the bidding contractors. The architect determines that the
c c c c c c c c c c c c
construction documents need to be revised.
c c c c c c
According to the A701-2018 Instructions to Bidders document, what should the architect
c c c c c c c c c c c
do in addition to revising the drawings? - answer-Issue an addendum
c c c c c c c c c c c
A homeowner wishes to have a three-hole practice golf course on their property. The
c c c c c c c c c c c c c
site design requires drainage to promote healthy soil and plant life.
c c c c c c c c c c c
Which type of site drainage system should the architect suggest? - answer-Swale
c c c c c c c c c c c
, Swale - answer-Shallow linear depressions that are designed into a sites surface in
c c c c c c c c c c c c
order to carry away storm water. They have no shoulders and are god for designs that
c c c c c c c c c c c c c c c c
require a seamless integration into a landscape
c c c c c c c
Terracing - answer-reduces soil erosion c c c c
Underdrainage - answer-Unless it is required, this wouldn't be used because it is
c c c c c c c c c c c c
expensive and prone to failure if not done right. A percolation test can determine if it is
c c c c c c c c c c c c c c c c c
needed. An example is a perforated drain tile
c c c c c c c c
Drainage Channel - answer-For carrying heavier amounts of rainfall, perhaps from a
c c c c c c c c c c c
collection of swales or other channels. It is deeper than a swale and has distinctive
c c c c c c c c c c c c c c c
shoulders.
c
Due to excessive groundwater, the architect has specified a perimeter drain around the
c c c c c c c c c c c c
building foundation.
c c
To which of the following could this drain pipe flow? - answer-Daylight, Sump Pump,
c c c c c c c c c c c c c
Storm Sewer System
c c c
Sump Pump - answer-Electric pump used to remove water from a basement or any
c c c c c c c c c c c c c
collection pit.
c c
A mechanical engineer is designing the HVAC system for a library. The system must be
c c c c c c c c c c c c c c
quiet and highly efficient for the comfort of the patrons and to provide necessary
c c c c c c c c c c c c c c
humidity levels to protect the books.
c c c c c c
Which of the following duct cross-sectional configurations should be specified? - answer-
c c c c c c c c c c c
Circular - no corners and less surface area for the same cross-sectional area so it has
c c c c c c c c c c c c c c c
less friction
c c
left hand reverse - answer-hinges on left, swinging out of room
c c c c c c c c c c
left hand - answer-hinges on left, swinging into room
c c c c c c c c
Right hand reverse - answer-hinges on right, swinging out of room
c c c c c c c c c c
right hand - answer-hinges on right, swinging into room
c c c c c c c c
Wood Embodied Energy - answer-185
c c c c
Sand and Gravel Embodied Energy - answer-18
c c c c c c
Lightweight Concrete Embodied Energy - answer-940 c c c c c
Gypsum Board Embodied Energy - answer-1830
c c c c c
Brickwork Embodied Energy - answer-2200 c c c c