Correct Answers 2025-2026. Rated A
*What is the recommended way to express a Feature or Capability? - ANS
Feature and benefit statement
During Inspect and Adapt, teams identified a large number of action items
aimed at solving their biggest problem as a train. How should the team
proceed? - ANSIdentify two or three improvement items and load them into
the Program Backlog
During the final plan review, Program risks are addressed using ROAM.
What do the letters in ROAM represent? - ANSOwned, Mitigated,
Resolved, Accepted
How often should System Demos occur in the default SAFe cadence? -
ANSEvery 2 weeks
Implementing SAFe requires buy-in from all levels of the organization.
What level of leadership is most important for effecting cultural change? -
ANSExecutive Management
In the Program Kanban some of steps have Work-in-Process limits. Why is
this necessary? - ANSTo help continuous deployment- to enable flow in
pull based system
1
, Lifelong learning is a requirement for Lean-Agile Leaders, and it helps them
do what? - ANSDemonstrate the values they want the teams to embody
(pg 157)
On day two of PI Planning, adjustments are made by the group based on
the previous day's management review and problem solving meeting. What
are three possible types of changes? - ANSBusiness priorities
Movement of people
Changes to scope
Peter Drucker defines knowledge workers as individuals who know more
about the work they perform than who? - ANSTheir bosses (pg 161)
Product Management has content authority over Features. What do
Product Owners have content authority over? - ANSTeam Backlog
The Agile Release Train passes through four steps in order to deliver
Solutions which includes: defining new functionality, implementing,
acceptance testing, and what else? - ANSDeploying
The Agile Release Train uses which type of teams to get work done? -
ANSCross-functional teams
The House of Lean is a classic metaphor describing the mindset essential
for Lean thinking. Which one of the four pillars advocates a "Get out of the
office" mindset? - ANSInnovation
2