100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

nursing_informatics_and_the_foundation_of_knowledge_4th_edition_mcgonigle.docx.pdf

Rating
-
Sold
-
Pages
21
Grade
A+
Uploaded on
01-11-2025
Written in
2025/2026

nursing_informatics_and_the_foundation_of_knowledge_4th_edition_

Institution
CNA - Certified Nursing Assistant
Course
CNA - Certified Nursing Assistant










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CNA - Certified Nursing Assistant
Course
CNA - Certified Nursing Assistant

Document information

Uploaded on
November 1, 2025
Number of pages
21
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

CTS TEST 2025


What are the four teams that comprise the overall Project Team? - CORRECT
ANSWER-Owner, Design, Installation, and Management

Who would belong to the Design team? - CORRECT ANSWER-Anyone with Consultant
in their title except the moving consultant

Which groups make up the Management Team? - CORRECT ANSWER-Developer,
Construction Manager, and Building Management Agency

The End-User, Facility Manager and Building Committee comprise which team within
the Project Team? - CORRECT ANSWER-Owner

Which group represent the generic roles that are important to the Project process? -
CORRECT ANSWER-Project Managers, Designers and Installers

Which project characteristics must be considered in order to determine which method is
best suited for a particular project? - CORRECT ANSWER-Schedule, Size, Type,
Complexity, and Procurement Requirements

What is an important aspect of funding that has a direct impact on the project process
and design/installation? - CORRECT ANSWER-Technical Support Funding

Whether a construction project is large or small, which milestones must be achieved in
a typical schedule? - CORRECT ANSWER-Programming, Building Design, AV Bid, and
Move-In

What type of project is a typical Consultant-Led Design-Bid-Build contract structure
good for? - CORRECT ANSWER-Long term projects with extended project cycles

,What is the risk in using an OFE/Integrator Installed contract structure? - CORRECT
ANSWER-System and infrastructure design and facility functionality may suffer

What are some of the important project scope and size considerations in selecting an
AV provider? - CORRECT ANSWER-Financial Stability, Current Workload, and
Company Credentials

What type of document typically includes Project Size Requirements, Corporate Profile,
Team Personnel, and Warranty Response Time? - CORRECT ANSWER-RFQ

a significant difference between the Two-Envelope Bid
Method and the Qualifications- Based Selection Method? - CORRECT ANSWER-
Negotiate with the highest ranking firm to finalize the contract

What is one of the disadvantages of contracting the AV integrator to the electrical
subcontractor? - CORRECT ANSWER-More layers of responsibility and communication

When conducting a complete project bid process, what milestone follows the issuing of
the RFP? - CORRECT ANSWER-Pre-Bid Meeting

Under what circumstances would you likely use an A305-1986 form? - CORRECT
ANSWER-Scoring responses to an RFQ

What is the ideal way to contract an AV integrator? - CORRECT ANSWER-Directly to
the Owner

The process of identifying the activities that end-users need to perform, and developing
the functional descriptions of your systems is referred to as:? - CORRECT ANSWER-
Needs Analysis

What is the main task of the third Step of the Program Phase of a Project? - CORRECT
ANSWER-Conducting program meetings

What should be included in the written Program Report? - CORRECT ANSWER-...A
conceptual and functional system description

The more accurate means to estimate dimensions of a commercial space during a site
inspection would be to? - CORRECT ANSWER-Count Ceiling Tiles in a drop tile
instalation

A client requires a new boardroom. The sales person and engineer are sent to the
premises to measure the facility and talk to the client. At this stage they should be
performing a _ - CORRECT ANSWER-Needs Analysis

Sightlines for audience viewing in a given presentation space can be improved by: -
CORRECT ANSWER-Providing a sloped, or stepped, seating arrangement

, After presenting a proposal, what is the correct plan of action for following up with the
client? - CORRECT ANSWER-Regularly, until a decision is made

AV professionals determine the end user's needs by examining three things: the
required applications, the tasks, and the: - CORRECT ANSWER-Functions to support
the applications

When working with a client to design an AV solution for a new conference center, the
client requests a detailed budget for the equipment and installation. What phase is the
project in? - CORRECT ANSWER-Design phase

The HDTV aspect ratio is equal to which of the following? - CORRECT ANSWER-1.78:1

Please select the appropriate resolution for SXGA. - CORRECT ANSWER-1280 x 1024

The Brightness control adjusts which level? - CORRECT ANSWER-Black Level

For what purpose would the AV technician designate a loopback internet protocol
address in the 127.0.0.1 to 127.255.255.254 range in a network configuration? -
CORRECT ANSWER-To test the local device to see if TCP/IP is working on your
system

It is important to consider Polar Patterns when____ - CORRECT ANSWER-Selecting
Microphones for use at live events

When training a new user how to operate the solution that has been provided, which of
the following is a best practice? - CORRECT ANSWER-Provide complete user
documentation prior to training

What is a benefit of offering a free training session for a client with new equipment? -
CORRECT ANSWER-It is a positive approach for a long-term partnership

Which phase comes first in a project? - CORRECT ANSWER-The Program Phase

A dimmer rack with a constant load capability is powering twenty four incandescent
lights during a stage production. The dimmer rack is running on a steady 230VAC
supply and averaging approximately 98 amps draw. Suddenly the line voltage drops to
211VAC. Calculate the expected amperage draw. - CORRECT ANSWER-90 amps

When terminating a Category 5e cable with an 8P8C (RJ-45) connector, it is best
practice to untwist each wire pair: - CORRECT ANSWER-As little as possible to get
each wire to enter the proper channel in the connector

A camera was installed about 180' (55m) from its 1.5A 12v power supply, the power
supply is dead, and needs replacing. Assuming that the camera can operate normally
$12.39
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
ibrahibraaa

Get to know the seller

Seller avatar
ibrahibraaa Cambridge College
View profile
Follow You need to be logged in order to follow users or courses
Sold
2
Member since
3 months
Number of followers
0
Documents
122
Last sold
2 months ago
ibrahibraa

Welcome to my Stuvia shop! Here you’ll find high-quality study guides, exam prep materials, summaries, and notes to help you save time and boost your grades. All documents are well-organized, easy to understand, and created to make your learning experience easier. Whether you’re preparing for exams or reviewing coursework, you’ll find reliable resources here.

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions