BOMI: Air Handling, Water Treatment & Plumbing Systems EXAM (updated 2025) Questions & Answers | Latest Already Graded A+ UPDATE 2025|2026
BOMI: Air Handling, Water Treatment & Plumbing Systems EXAM (updated 2025) Questions & Answers | Latest Already Graded A+ UPDATE 2025|2026 BOMI - Correct Answer Air Handling, Water Treatment & Plumbing System Chapter 1 - Correct Answer Human Comfort Review Quiz 1 - Correct Answer 1 - The rate of exchange of fresh air for returned air in an air conditioning-system is based on the period of time covered and the number of building: - Correct Answer Occupants 2 - All of the 3 following are methods of heat - Correct Answer Radiation Convection Conduction NOT Reduction 3 - Which heat load source is most likely to affect all zones of a building? - Correct Answer Lighting equipment 4 - To compensate for heat gain from office equipment in modern office building, air-conditioning systems have been designed to offset how many watts per square foot? - Correct Answer 1 to 3 Watts per square foot. 5 - The leftover heat in a building from the day before is the: - Correct Answer Pull-down load
Written for
- Institution
- BOMI
- Course
- BOMI
Document information
- Uploaded on
- November 1, 2025
- Number of pages
- 57
- Written in
- 2025/2026
- Type
- Exam (elaborations)
- Contains
- Questions & answers