100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

BUS 370 Final Exam 2 Questions And 100% Correct Answers Updated.

Rating
-
Sold
-
Pages
9
Grade
A+
Uploaded on
30-10-2025
Written in
2025/2026

capacity - Answer the capability of a worker, machine, work center, plant or organization to produce output per time period measures of capacity - Answer in terms of inputs, outputs, or a combo ex: jiffy lube=oil changes per hour law firm=billable hours college= student hours per semester theoretical capacity - Answer the max output capability, allowing for no adjustments for preventive maintenance or unplanned downtime rated capacity - Answer the long-term, expected output capability of a resource or system lead capacity strategy - Answer a capacity strategy in which capacity is added in anticipation of BEFORE demand lag capacity strategy - Answer a capacity strategy in which capacity is added only AFTER demand has materialized typically a good strategy for mature, cost sensitive products and services methods of evaluating capacity alternatives - Answer fixed & variable costs indifference point break even point expected value decision tree total cost - Answer FC + VC(units) indifference point - Answer the output level at which 2 capacity alternatives generate equal cost

Show more Read less









Whoops! We can’t load your doc right now. Try again or contact support.

Document information

Uploaded on
October 30, 2025
Number of pages
9
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

BUS 370 Final Exam 2 Questions And
100% Correct Answers 2025-2026
Updated.
capacity - Answer the capability of a worker, machine, work center, plant or organization to
produce output per time period



measures of capacity - Answer in terms of inputs, outputs, or a combo

ex: jiffy lube=oil changes per hour

law firm=billable hours

college= student hours per semester



theoretical capacity - Answer the max output capability, allowing for no adjustments for
preventive maintenance or unplanned downtime



rated capacity - Answer the long-term, expected output capability of a resource or system



lead capacity strategy - Answer a capacity strategy in which capacity is added in anticipation of
BEFORE demand



lag capacity strategy - Answer a capacity strategy in which capacity is added only AFTER
demand has materialized

typically a good strategy for mature, cost sensitive products and services



methods of evaluating capacity alternatives - Answer fixed & variable costs

indifference point

break even point

expected value

decision tree



total cost - Answer FC + VC(units)

, expected value - Answer a calculation that summarizes the expected costs, revenues, or
profits of a capacity alternative based on several demand levels, each of which has a different
probability

step 1: calculate total cost

step 2: calculate expected value



decision tree - Answer a visual tool that decision makers use to evaluate capacity decisions to
enable users to see the interrelationships between decisions and possible outcomes



decision tree rules - Answer draw tree left to right starting with decision point and develop
branches from there

decision point=squares

outcome point=circles

for EV problems, calculate the financial results for each of the smaller branches and move
backward by calculating weighted avg for branches based on problems



Forter's Market case study - Answer roast coffee himself vs. buying roasted coffee

indifference point 25000

higher EV was roasting it himself



learning curves - Answer recognize that people become more productive over time due to
learning

-for every doubling of cumulative output, there is a set percentage reduction in the amount of
inputs required



learning rate - Answer 2nd time/1st time



theory of constraints - Answer an approach to visualizing and managing capacity that
recognizes that nearly all products and services are created through a series of linked processes
and in every case, there is at least one process step that limits throughput for the entire chain



steps to improve constraints - Answer 1. identify the constraint

2. exploit the constraint - keep it busy

3. subordinate everything to constraint- strive for 100% utilization

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TestSolver9 Webster University
View profile
Follow You need to be logged in order to follow users or courses
Sold
753
Member since
2 year
Number of followers
124
Documents
24593
Last sold
18 hours ago
TESTSOLVER9 STORE

TOPNOTCH IN LEARNING MATERIALS,(EXAMS,STUDYGUIDES NOTES ,REVIEWS,FLASHCARDS ,ALL SOLVED AND PACKAGED.OUR STORE MAKE YOUR EDUCATION JOURNEY EFFICIENT AND EASY.WE ARE HERE FOR YOU FEEL FREE TO REACH US OUT .

3.6

131 reviews

5
59
4
19
3
22
2
9
1
22

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions