MSSC Final Practice Test Questions And Answers Verified 100% Correct __________ is responsible to align the team, establish direction, and to motivate and inspire. - ANSWER Leadership One of the results of Straighten is to __________. - ANSWER Arrange items in the order of their use Which 5S step uses labels to clearly identify equipment? - ANSWER Straighten In which 5S step does the employee look for damaged equipment, worn components, and misplaced objects? - ANSWER Shine Process cycle time is the time required to complete the production of __________ from start to finish. - ANSWER One unit of product What is the rate at which each product must be produced to keep up with demand? - ANSWER Takt time __________ should be consistent with a company's strategic goals and objectives and support the overall business plan. - ANSWER Production plans What are included on a manufacturing work order? - ANSWER Order and item number Scheduling overtime is one of the ways to __________ when the production line is already operating at maximum speed. - ANSWER Increase production What is the greatest amount of products a system can produce per day? - ANSWER Production capacity What is the unit of measure for Part # FRM-102 described in the following manufacturing work order? - ANSWER Each Customer relationship data is stored in a __________ that can be used to record concerns with specific products. - ANSWER ERP or database system If capacity is reached, reallocation of equipment and resources is one way to __________ to meet demand. - ANSWER Increase production In preparation for repeat orders from a customer, companies __________. - ANSWER Store order information and product specifications on file A __________ provides information to the manufacturing department about the product that is to be made and authorizes inventory to be issued to begin the job. - ANSWER Manufacturing work order Customer lead time is the time between customer order and __________. - ANSWER Product delivery In a production process, the time required to create a finished product is determined by the slowest processing station. The slowest station, often called a __________, therefore limits the maximum rate of production. - ANSWER Bottleneck The daily production schedule is used to allocate the necessary people and equipment to ensure that __________. - ANSWER The required production goals are achieved What is throughput? - ANSWER Products produced in a given amount of time If the correct raw material is not available, the employee should __________. - ANSWER Inform the supervisor What is another name for lean production? - ANSWER Just-in-Time Prompt communication with a supervisor is necessary when __________. - ANSWER The production schedule cannot be met The supervisor should be notified immediately if __________. - ANSWER The work order is incorrect What is the purpose of a kanban system? - ANSWER Communicate needs within production To identify and eliminate bottlenecks, the __________ required to complete each process must be determined first. - ANSWER Time Production capacity is a measure of a department's ability to meet __________. - ANSWER Customer demand What is the definition of manufacturing resource planning? - ANSWER Computer system used to schedule production All shipping documents should be filed away in a __________ and in accordance to __________ policy, after shipment is complete. - ANSWER Safe storage place / company To help track spending and budgeting operating expenses, a __________ form is used to replenish supplies or tools needed for the job. - ANSWER Material requisition Items should be placed in a box that __________. - ANSWER Is sized to fit so that it does not move excessively after cushioning material is added Shipping weight on a bill of lading is usually expressed in __________. - ANSWER Lbs or kgs Product damage can be avoided by __________. - ANSWER Following packaging specifications When issued the incorrect, non-conforming, or wrong amount of parts from supply, use a __________ form to correct the issue. - ANSWER Discrepant material The box certificate shown has an edge crush limit of __________. - ANSWER 32 pounds/inch Bursting test strength on a box certificate tells the box's ability to withstand __________ of the amount shown. - ANSWER Internal and external forces Item counts are verified by what? - ANSWER Physical inventory It is most important to clearly label any containers of __________ material before shipping. - ANSWER Flammable or hazardous __________ counts any materials that have been issued to a manufacturing order that have not been produced into a finished product. - ANSWER Work-in-progress inventory What type of shipping uses a truck that may have to make two or more stops to different companies to achieve a full load? - ANSWER Less-than-truckload (LTL) Before packaging an item for shipment, the shipping agent should always check for a __________ indicating that the item meets compliance, approved, and is OK to ship. - ANSWER Inspection label A bill of lading can also be used to determine if emergency action is needed in case of

Show more Read less
Institution
MSSC
Course
MSSC









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
MSSC
Course
MSSC

Document information

Uploaded on
October 26, 2025
Number of pages
8
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

MSSC Final Practice Test Questions And Answers
Verified 100% Correct

__________ is responsible to align the team, establish direction, and to motivate and
inspire. - ANSWER Leadership

One of the results of Straighten is to __________. - ANSWER Arrange items in the
order of their use

Which 5S step uses labels to clearly identify equipment? - ANSWER Straighten

In which 5S step does the employee look for damaged equipment, worn components,
and misplaced objects? - ANSWER Shine

Process cycle time is the time required to complete the production of __________ from
start to finish. - ANSWER One unit of product

What is the rate at which each product must be produced to keep up with demand? -
ANSWER Takt time

__________ should be consistent with a company's strategic goals and objectives and
support the overall business plan. - ANSWER Production plans

What are included on a manufacturing work order? - ANSWER Order and item number

Scheduling overtime is one of the ways to __________ when the production line is
already operating at maximum speed. - ANSWER Increase production

What is the greatest amount of products a system can produce per day? - ANSWER
Production capacity

What is the unit of measure for Part # FRM-102 described in the following
manufacturing work order? - ANSWER Each

Customer relationship data is stored in a __________ that can be used to record
concerns with specific products. - ANSWER ERP or database system

If capacity is reached, reallocation of equipment and resources is one way to
__________ to meet demand. - ANSWER Increase production

, In preparation for repeat orders from a customer, companies __________. - ANSWER
Store order information and product specifications on file

A __________ provides information to the manufacturing department about the product
that is to be made and authorizes inventory to be issued to begin the job. - ANSWER
Manufacturing work order

Customer lead time is the time between customer order and __________. - ANSWER
Product delivery

In a production process, the time required to create a finished product is determined by
the slowest processing station. The slowest station, often called a __________,
therefore limits the maximum rate of production. - ANSWER Bottleneck

The daily production schedule is used to allocate the necessary people and equipment
to ensure that __________. - ANSWER The required production goals are achieved

What is throughput? - ANSWER Products produced in a given amount of time

If the correct raw material is not available, the employee should __________. -
ANSWER Inform the supervisor

What is another name for lean production? - ANSWER Just-in-Time

Prompt communication with a supervisor is necessary when __________. - ANSWER
The production schedule cannot be met

The supervisor should be notified immediately if __________. - ANSWER The work
order is incorrect

What is the purpose of a kanban system? - ANSWER Communicate needs within
production

To identify and eliminate bottlenecks, the __________ required to complete each
process must be determined first. - ANSWER Time

Production capacity is a measure of a department's ability to meet __________. -
ANSWER Customer demand

What is the definition of manufacturing resource planning? - ANSWER Computer
system used to schedule production

All shipping documents should be filed away in a __________ and in accordance to
$10.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
TopGradeGuru
1.5
(2)

Get to know the seller

Seller avatar
TopGradeGuru Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
10
Member since
1 year
Number of followers
0
Documents
2429
Last sold
1 month ago
GRADEHUB

We provide access to a wide range of professionally curated exams for students and educators. It offers high-quality, up-to-date assessment materials tailored to various subjects and academic levels. With instant downloads and affordable pricing, it's the go-to resource for exam preparation and academic success.

1.5

2 reviews

5
0
4
0
3
0
2
1
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions