MSSC Certification Exam Study Guide Questions And Answers Verified 100% Correct Heavy axial loads are better handled by ________? - ANSWER angular contact bearings High temperature can _____________ of a bearing. - ANSWER limit life Housekeeping inspections and audits should include - ANSWER Unbiased auditors or inspectors How is a cam likely to be mounted on a shaft? - ANSWER welded How many extension cords are permitted to run across the floor of a workstation? - ANSWER 0 If a company does follow-up work after a PM that is considered ________maintenance. - ANSWER reactive If a machine is expected to have downtime for several shifts, the appropriate communication between shifts for Lockout/Tagout procedures is - ANSWER verify energy state on machine, then change locks If a motor starts blowing fuses or tripping thermals, the most likely cause is - ANSWER An overload motor If a technician has unwired a motor from a disconnect and the circuit breaker still trips, the next logical step is to ______ and see if the breaker trips again. - ANSWER replace the circuit breaker If suspended metal products were found in oil analysis, it would indicate - ANSWER Bearing problems In a PM audit, the _____ would likely be negatively impacted if there were a large number of uncompleted PM work orders. - ANSWER critical path It is important to have a/an ____________ to complete the PM work on a machine - ANSWER completion date Leveling all machine components prior to coupling them _____________. - ANSWER reduces the number of needed shims Low pressure in a hydraulic pump's suction line causes what malfunction? - ANSWER cavitation Lubrication and other _____________ maintenance activities should be checked daily to ensure they are performed. - ANSWER preventive Machine closures usually have _______ to prevent entry during machine operation. - ANSWER limit switch - interlocks and photocells Making sure that a motor shaft is level - ANSWER increases stress on the motor Misaligned coupling can cause _________ in machinery. - ANSWER vibration Motor shaft runout is checked to make sure of proper _____________. - ANSWER alignment of mating components NOT logic is formed by _____________. - ANSWER one normally closed switch Oxygen cylinders must be kept ______ away from combustion points. - ANSWER 25 ft. Predictive maintenance is a type of maintenance program that does what function? - ANSWER identifies machine parts or components failures before a major breakdown Preventive maintenance schedule would commonly include - ANSWER frequency Prior to shutting down a machine for preventive maintenance, the operator must - ANSWER remove all the debris and any residue from the machine Proper storage of tools helps keep them - ANSWER in good working order Reactive Maintenance is considered a(n) _____________ activity. - ANSWER unplanned maintenance Scheduled housekeeping inspections would ordinarily include - ANSWER verification that the floor is clean and free of debris Scheduled replacement of minor parts that tend to wear out quickly is an important parts of _______maintenance - ANSWER preventive Seizing, in reference to bearings and shafts, is a condition resulting from - ANSWER lack of lubrication Shaft coupling are critical parts of any transmission system. Which one of these can cause a coupling to fail? - ANSWER all of the above (Shaft failure b. wear c. All of these d. corrosion) Smaller dirt particles are removed from the air by the filter's - ANSWER element The best place for an operator to find information regarding the handling of all lubricants and safety precaution is in - ANSWER SDS The drive motor and equipment are protected by overload clutches when - ANSWER something jams or binds in the machinery The flexible or rigid protection for electrical wiring to motors is provided mainly for the prevention of - ANSWER damage The following is an important key planned maintenance activity - ANSWER Lubrication of equipment The most common maintenance problem with vibration on fans is caused by - ANSWER sediment and product buildup The most obvious indicator that the V-belt pulleys are worn beyond usefulness is when the - ANSWER belt is touching the bottom of the groove The part of electrical circuits that gives the operator control is the - ANSWER input devise The primary purpose of a switch - ANSWER Energize and DE energize circuits The procedure for identifying machine component failure prior to major breakdown is referred to as a _________ maintenance program. - ANSWER preventive The two major types of misalignment that are corrected by shaft alignment are _____________. - ANSWER angular and parallel The worst enemy of hydraulic system is - ANSWER contamination

Show more Read less
Institution
MSSC Certification
Course
MSSC Certification









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
MSSC Certification
Course
MSSC Certification

Document information

Uploaded on
October 26, 2025
Number of pages
8
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

MSSC Certification Exam Study Guide
Questions And Answers Verified 100% Correct
Heavy axial loads are better handled by ________? - ANSWER angular contact
bearings

High temperature can _____________ of a bearing. - ANSWER limit life

Housekeeping inspections and audits should include - ANSWER Unbiased auditors or
inspectors

How is a cam likely to be mounted on a shaft? - ANSWER welded

How many extension cords are permitted to run across the floor of a workstation? -
ANSWER 0

If a company does follow-up work after a PM that is considered ________maintenance.
- ANSWER reactive

If a machine is expected to have downtime for several shifts, the appropriate
communication between shifts for Lockout/Tagout procedures is - ANSWER verify
energy state on machine, then change locks

If a motor starts blowing fuses or tripping thermals, the most likely cause is -
ANSWER
An overload motor

If a technician has unwired a motor from a disconnect and the circuit breaker still trips,
the next logical step is to ______ and see if the breaker trips again. - ANSWER replace
the circuit breaker

If suspended metal products were found in oil analysis, it would indicate -
ANSWER
Bearing problems

In a PM audit, the _____ would likely be negatively impacted if there were a large
number of uncompleted PM work orders. - ANSWER critical path

It is important to have a/an ____________ to complete the PM work on a machine -
ANSWER completion date

Leveling all machine components prior to coupling them _____________. -
ANSWER

, reduces the number of needed shims

Low pressure in a hydraulic pump's suction line causes what malfunction? -
ANSWER
cavitation

Lubrication and other _____________ maintenance activities should be checked daily
to ensure they are performed. - ANSWER preventive

Machine closures usually have _______ to prevent entry during machine operation. -
ANSWER limit switch - interlocks and photocells

Making sure that a motor shaft is level - ANSWER increases stress on the motor

Misaligned coupling can cause _________ in machinery. - ANSWER vibration

Motor shaft runout is checked to make sure of proper _____________. -
ANSWER
alignment of mating components

NOT logic is formed by _____________. - ANSWER one normally closed switch

Oxygen cylinders must be kept ______ away from combustion points. - ANSWER 25 ft.

Predictive maintenance is a type of maintenance program that does what function? -
ANSWER identifies machine parts or components failures before a major breakdown

Preventive maintenance schedule would commonly include - ANSWER frequency

Prior to shutting down a machine for preventive maintenance, the operator must -
ANSWER remove all the debris and any residue from the machine

Proper storage of tools helps keep them - ANSWER in good working order

Reactive Maintenance is considered a(n) _____________ activity. -
ANSWER
unplanned maintenance

Scheduled housekeeping inspections would ordinarily include - ANSWER verification
that the floor is clean and free of debris

Scheduled replacement of minor parts that tend to wear out quickly is an important parts
of _______maintenance - ANSWER preventive
$10.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
TopGradeGuru
1.5
(2)

Get to know the seller

Seller avatar
TopGradeGuru Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
10
Member since
1 year
Number of followers
0
Documents
2429
Last sold
1 month ago
GRADEHUB

We provide access to a wide range of professionally curated exams for students and educators. It offers high-quality, up-to-date assessment materials tailored to various subjects and academic levels. With instant downloads and affordable pricing, it's the go-to resource for exam preparation and academic success.

1.5

2 reviews

5
0
4
0
3
0
2
1
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions