Scrum Master Training
Study online at https://quizlet.com/_hus6cn
1. What are two critical areas that differentiate Agile from waterfall develop-
ment?
a. Fast Feedback
b. Face-to-Face interaction
c. staggered integration
d. architectural runway
3. incremental delivery of value: A and E
2. Which statement is true about scrum?
a. It is a team-based framework
b. It is a set of technical software practices
c. It is a Lean System Engineering technique
d. It is ideal method for static design requirements: A
3. When does the Plan-do-CA cycle occur in Scrum?
a. Across all scrum events
b. In the daily stand-up
c. As part of the Iteration Retrospective
d. At the Iteration Review: A
4. What is the purpose of the Plan-Do-Check-Adjust cycle as applied to itera-
tions?
a. To create a continuous flow or work to support the delivery pipeline
b. To allow the team to perform some final backlog refinement for upcoming
Iteration planning
c. To provide a regular predictable developement cadence to produce an incre-
ment of value
d. to give the agile release train team members a process tool to kep the train
on the tracks: D
5. What is the recommended duration of a SAFe iteration?
a. 5 weeks
b. 2 weeks
c. 3 weeks
d. 4 weeks: B
1/6
, Scrum Master Training
Study online at https://quizlet.com/_hus6cn
6. Which statement is true about teams?
a. Agile Teams can manage daily interruptions
b. Products are more robust when individuals on teams have specific skill sets
c. Changes in team composition do not impact productivity
d. Teams are more productive than the same number of individuals: D
7. In SAFe, which activity is a scrum Master's responsibility?
a. Coordinating with other teams
b. Owning the daily stand-up
c. Prioritizing the team backlog
d. Facilitating the Scrum of Scrums: A
8. When is one time a Scrum Master may be a participant rather than a facilita-
tor?
a. when using ad hoc teams for Inspect and Adopt
b.If the entire team is present during DSU
c. During team breakout session at PI Planning
d. When the Agile Release Train does not require any team coordination: A
9. What is one responsibility of a SAFe Scrum Master?
a. Estimating the size and complexity of the work
b. Developing and communication the program vision and road-map
c. Running system and solution demos
d. Facilitating an effective team breakout session during PI Planning: D
10. Good coaches do not give people the answer, but instead do what?
a. They guide people to the solution
b. They hold them to their commitments
c. They limit the number of questions
d. they make the decisions: A
11. According to the Five Dysfunctions of a Team, what is a team's ultimate
competitive advantage?
a. Commitment
b. Transparency
c. Accountability
d. Teamwork: D
2/6
Study online at https://quizlet.com/_hus6cn
1. What are two critical areas that differentiate Agile from waterfall develop-
ment?
a. Fast Feedback
b. Face-to-Face interaction
c. staggered integration
d. architectural runway
3. incremental delivery of value: A and E
2. Which statement is true about scrum?
a. It is a team-based framework
b. It is a set of technical software practices
c. It is a Lean System Engineering technique
d. It is ideal method for static design requirements: A
3. When does the Plan-do-CA cycle occur in Scrum?
a. Across all scrum events
b. In the daily stand-up
c. As part of the Iteration Retrospective
d. At the Iteration Review: A
4. What is the purpose of the Plan-Do-Check-Adjust cycle as applied to itera-
tions?
a. To create a continuous flow or work to support the delivery pipeline
b. To allow the team to perform some final backlog refinement for upcoming
Iteration planning
c. To provide a regular predictable developement cadence to produce an incre-
ment of value
d. to give the agile release train team members a process tool to kep the train
on the tracks: D
5. What is the recommended duration of a SAFe iteration?
a. 5 weeks
b. 2 weeks
c. 3 weeks
d. 4 weeks: B
1/6
, Scrum Master Training
Study online at https://quizlet.com/_hus6cn
6. Which statement is true about teams?
a. Agile Teams can manage daily interruptions
b. Products are more robust when individuals on teams have specific skill sets
c. Changes in team composition do not impact productivity
d. Teams are more productive than the same number of individuals: D
7. In SAFe, which activity is a scrum Master's responsibility?
a. Coordinating with other teams
b. Owning the daily stand-up
c. Prioritizing the team backlog
d. Facilitating the Scrum of Scrums: A
8. When is one time a Scrum Master may be a participant rather than a facilita-
tor?
a. when using ad hoc teams for Inspect and Adopt
b.If the entire team is present during DSU
c. During team breakout session at PI Planning
d. When the Agile Release Train does not require any team coordination: A
9. What is one responsibility of a SAFe Scrum Master?
a. Estimating the size and complexity of the work
b. Developing and communication the program vision and road-map
c. Running system and solution demos
d. Facilitating an effective team breakout session during PI Planning: D
10. Good coaches do not give people the answer, but instead do what?
a. They guide people to the solution
b. They hold them to their commitments
c. They limit the number of questions
d. they make the decisions: A
11. According to the Five Dysfunctions of a Team, what is a team's ultimate
competitive advantage?
a. Commitment
b. Transparency
c. Accountability
d. Teamwork: D
2/6