NFPA 24 Test (TFM10) Exam Questions and Answers 2025
1. This standard shall apply to intended to carry water for fire service mains - correct
answer - Combined Service Mains
2. Working plans shall be submitted for approval to the before any equipment is
installed or remodeled. - Correct answer - AHJ
3. shall not be used - correct answer - Pressure-Regulating devices
4. shall not be installed in the piping from the fire department connection
to the fire service main - correct answer - Control Valves
, NFPA 24 Test (TFM10) Exam Questions and Answers 2025
5. shall be permitted in the system downstream of the fire department
connection - correct answer - Control Valves
6. When more than one water supply exists, a shall be installed in each connection -
correct answer - Check Valve
7. All check valves shall have a installed upstream and downstream of the check valve. -
correct answer - Control Valve
8. A post indicator valve installed not less than from the building - correct answer - 40 ft
9. Where post indicator valves are used, they shall be set so that the top of each post is
above final grade - correct answer - 32-40 inches
10. Supervision of underground gate valves with roadway boxes shall