Does an Agency CM have to deliver a project for a guaranteed maximum price? -
Correct answer-no
Which of the following project delivery methods includes all parties in a single
contract? - Correct answer-Design-Build
Which of the following discuss the quantity of work to be performed on a proposed
construction project? - Correct answer-Construction plans/drawings
The "contract documents" includes plans and specifications? - Correct answer-true
Which is a factor of project performance that can be tracked and used as a way to
"keep score" - Correct answer-time
ADA Stands for Americans With Disabilities Act, which was passed into law in
1990. - Correct answer-true (ada)
With a residential single-family home, built by a home builder (company), who
usually hires the sub-contractors? - Correct answer-the builder
©COPYRIGHT 2025, ALL RIGHTS RESERVED 1
, Residential Buildings can house multiple family units. - Correct answer-true
(correct)
Sequence the construction activities from first performed to last performed. -
Correct answer-1)obtain building permits
2)install the frame
3)install flooring
4)have home approved by code inspector
CSI Division 11 - Correct answer-equipment
GC is an acronym for which one of the following? - Correct answer-General
Contractor
On a NON-RESIDENTIAL construction project, the Owner may directly hire the
following entities: - Correct answer-masonry contractor, architect, electrical
engineer
Sub-contractors can sub-contract work to - Correct answer-other sub-contractors
Owners can be partnerships between - Correct answer-multiple companies.
What is one part of the construction project a General Contractor is most likely to
self-perform? - Correct answer-concrete
©COPYRIGHT 2025, ALL RIGHTS RESERVED 2
Answers
Does an Agency CM have to deliver a project for a guaranteed maximum price? -
Correct answer-no
Which of the following project delivery methods includes all parties in a single
contract? - Correct answer-Design-Build
Which of the following discuss the quantity of work to be performed on a proposed
construction project? - Correct answer-Construction plans/drawings
The "contract documents" includes plans and specifications? - Correct answer-true
Which is a factor of project performance that can be tracked and used as a way to
"keep score" - Correct answer-time
ADA Stands for Americans With Disabilities Act, which was passed into law in
1990. - Correct answer-true (ada)
With a residential single-family home, built by a home builder (company), who
usually hires the sub-contractors? - Correct answer-the builder
©COPYRIGHT 2025, ALL RIGHTS RESERVED 1
, Residential Buildings can house multiple family units. - Correct answer-true
(correct)
Sequence the construction activities from first performed to last performed. -
Correct answer-1)obtain building permits
2)install the frame
3)install flooring
4)have home approved by code inspector
CSI Division 11 - Correct answer-equipment
GC is an acronym for which one of the following? - Correct answer-General
Contractor
On a NON-RESIDENTIAL construction project, the Owner may directly hire the
following entities: - Correct answer-masonry contractor, architect, electrical
engineer
Sub-contractors can sub-contract work to - Correct answer-other sub-contractors
Owners can be partnerships between - Correct answer-multiple companies.
What is one part of the construction project a General Contractor is most likely to
self-perform? - Correct answer-concrete