100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

SOS NERC PREP - RELIABILITY EXAM LATEST 2026 ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+

Rating
-
Sold
-
Pages
63
Grade
A+
Uploaded on
14-10-2025
Written in
2025/2026

SOS NERC PREP - RELIABILITY EXAM LATEST 2026 ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+

Institution
Sos Nerc
Course
Sos nerc











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Sos nerc
Course
Sos nerc

Document information

Uploaded on
October 14, 2025
Number of pages
63
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

SOS NERC PREP - RELIABILITY EXAM LATEST
2026 ACTUAL EXAM 200 QUESTIONS AND
CORRECT DETAILED ANSWERS (VERIFIED
ANSWERS) |ALREADY GRADED A+

A)

If the frequency bias setting is less negative than the frequency response of a Balancing
Authority and a frequency decline is caused by a sudden loss of generation in an external
balancing area, what will be the result?

A) The ACE will be a negative value and AGC will increase generation.

B) This will not affect the ACE.

C) The ACE will be a positive value and AGC will lower generation.

D) The ACE will be zero and will take no AGC action. - ANSWER>>C) The ACE will be a positive
value and AGC will lower generation.

It is the responsibility of which entity/entities to develop, maintain, and implement load
shedding plans?

A) Transmission Operators and Balancing Authorities

B) Reliability Coordinator

C) Load Serving Entities

D) Balancing Authority - ANSWER>>A) Transmission Operators and Balancing Authorities

A Transmission line is loaded 25% above its SOL. A parallel line is out for routine maintenance
and can be placed in service in 10 minutes. What is the first step the Operator should take to
reduce the line loading?

A) Shed load at the downstream bus.


B) Open the line.

,C) Re-Dispatch Generation.

,D) Initiate the restoration of the parallel line. - ANSWER>>D) Initiate the restoration of the
parallel line.

The Reliability Coordinator just informed you of a slow time error correction which will begin at
the top of the next hour. Your EMS system will not let you change your scheduled frequency.
Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take?

A) Increase Net Interchange Schedule by 20 MWs.

B) Inform the Reliability Coordinator that you cannot participate in the time error correction.

C) Decrease Net Interchange Schedule by 20 MWs.

D) Increase Net Interchange Schedule by 10 MWs. - ANSWER>>A) Increase Net Interchange
Schedule by 20 MWs.

A Balancing Authority has a sudden loss of a large block of load in its area. This loss will be seen
instantaneously in the change of which of the following values?

1. Actual Net Interchange
2. Scheduled Frequency
3. Scheduled Net Interchange
4. Area Control Error

A) 4 only
B) 1 & 3
C) 1 & 4
D) 3 & 4 - ANSWER>>C) 1 & 4

Metered Data included in the calculation of ACE are: dynamic schedules, pseudo ties, actual
frequency, and all .

A) Tie lines readings
B) Generators output

, C) Scheduled frequency indications
D) Transformer load - ANSWER>>A) Tie lines readings

Balancing Authority A is currently reading a system frequency of 60.00 Hz. Its Net Actual
Interchange is +100 MW and its Net Scheduled Interchange is +200 MW. If Balancing Authority
A's frequency bias setting is 100 MW/0.1 Hz, what is ACE?

A) -100
B) 0
C) 10
D) 100 - ANSWER>>A) -100

A Balancing Authority has a Net Interchange Schedule of -250 MWs from 1200 to 1600 on a
summer day. The Net Interchange Actual for those same hours respectively were -230 MW, -
275 MW, -250 MW and -270 MW. What was the Balancing Authority's Inadvertent Interchange
for the 4-hour period?

A) 6 MWs out
B) 25 MWs in
C) 25 MWs out
D) 6 MWs in - ANSWER>>B) 25 MWs in

For the ACE equation to work properly, dynamic schedules, pseudo ties, frequency, and all
must be metered.

A) Generation
B) Communications
C) Transformers
D) Tie lines - ANSWER>>D) Tie lines

If the frequency bias setting is set to a less negative value than the frequency response of a
Balancing Authority and a frequency increase is caused by a sudden loss of load in an external
balancing area, what will be the result?

B) The ACE will be zero and will take no AGC action

C) The ACE will be a negative value and AGC will increase generation

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
PassPapersPro Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
15
Member since
6 months
Number of followers
0
Documents
1090
Last sold
1 week ago
PassPapersPro / Verified Exam Q&A for All Courses

NURSING +ALL COURSES VERIFIED QUESTIONS AND ANSWERS REAL EXAM QUESTIONS, VERIFIED ANSWERS AND SUMMARIZED PAST PAPERS. PERFECT FOR ANYONE AIMING FOR TOP GRADES. UPDATED WEEKLY. STUDY SMART. PASS FAST.

4.3

4 reviews

5
2
4
1
3
1
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions