SIMMONS/ODE, ELECTRICAL WIRING COMMERCIAL, 18E © 2024, 9780357767115; CHAPTE R R R R R R R R
R 1:COMMERCIAL BUILDING PLANS AND SPECIFICATIONS
R R R R R
TABLE OF CONTENTS R R
Review .......................................................................................................................................................... 1
Note to instructor: It is recommended that students be required to respond, where appropriate
r r r r r r r r r r r r r
, with answers that are complete sentences.
r r r r r r
REVIEW
Refer to the National Electrical Code or the working drawings when necessary. Where applicable,
r r r r r r r r r r r r r r
responses should be written in complete sentences. r r r r r r
1. What section of a commercial building’s specification contains a list of contract doc
r r r r r r r r r r r r
uments?
Answer: A list of the contract documents is contained in General Clauses and Conditions. A listing of
r r r r r r r r r r r r r r r r
r the Commercial Building contract documents is presented in this chapter under the heading “Comme
r r r r r r r r r r r r r
rcial Building Plans.” The instructor may wish to have the students check over this listing and compar
r r r r r r r r r r r r r r r r
e it with the plans provided.
r r r r r
2. The requirement for temporary light and power at the job site will be found in what porti
r r r r r r r r r r r r r r r r
on of a commercial building’s specification?
r r r r r
Answer: The Supplementary General Conditions specifies the job site requirements for temporary li
r r r r r r r r r r r r
ght and power. In some contracts, this electrical system becomes the responsibility of the general cont
r r r r r r r r r r r r r r r
ractor; in other contracts, it is the electrical contractor’s responsibility to install and maintain the temp
r r r r r r r r r r r r r r r
orary electrical system. The instructor may wish to refer the student to NEC Article 590 and discuss th
r r r r r r r r r r r r r r r r r
e requirements in detail.
r r r
A+ Page 2 r
,3. The electrician uses the Schedule of Working Drawings for what purpose?
r r r r r r r r r r
Answer: The electrician uses the Schedule of Working Drawings to determine whether all of the dra
r r r r r r r r r r r r r r r
wings are at hand. The information on “the other sheets” may be very important, especially in coordin
r r r r r r r r r r r r r r r r
ating with other contractors.
r r r
4. Complete the following items by indicating the letter(s) designating the correct source(s) of i
r r r r r r r r r r r r r
nformation:
No. Answer Item Information
4. Sections Ceiling height r Sections, Sheet A6 r r
5. Electrical symb r Electrical receptacle styl Electrical symbol schedule, Chapter 2,
r r r r r r
ol schedule
r e Figure 2–6 r
6. Electrical r Electrical outlet locatio r r Electrical layout drawings, Sheets El,E r r r r
layout dr r n 2, and E3
r r
awings
7. Elevations Exterior wall finishes r r Elevations, Sheets A4 and A5 r r r r
8. Site plan r Grading elevations r Site plan, Sheet A4
r r r
9. Electrical r Panelboard schedules r Electrical layout drawings, Sheet E4 r r r r
layout dr r
awings
10. Architectural flo r Room width r Architectural floor plan, Sheets Al, A2, r r r r r
or plan r and A3 r
11. Architectural flo r Swing of door r r Architectural floor plan, Sheets Al, A2, r r r r r
or plan r and A3 r
12. Sections View of interior wall
r r r Sections, Sheet A6 r r
A+ Page 3 r
, Match the items on the left with those on the right by writing the letter designation o
r r r r r r r r r r r r r r r r
fthe appropriate organization from the list on the right.
r r r r r r r r
13. NEC Electrical Code r National Electrical Code (NEC)
r r r
14. IAEI Electrical inspectors r
International Association of r r r
ElectricalInspectors (IAEI) r
15. NFPA Fire codes
r National Fire Protection Association (
r r r r
NFPA)
16. IESNA Lighting information r Illuminating Engineering r r
Society ofNorth America r r r
(IESNA)
17. UL Listing service r Underwriters Laboratories, Inc. (UL) r r r
18. NEMA Manufacturers’ standard r National Electrical Manufacturers
r r
s Association (NEMA) r
19. PE Seal Professional Engineer (PE) r r
Match the items on the left with those on the right by writing the letter design
r r r r r r r r r r r r r r r
ation ofthe proper level of NEC interpretation from the list on the right.
r r r r r r r r r r r r
20. with specia r Allowed by the Code r r r Shall be permitted, or Shall not be
r r r r r r
l permissio
r required, NEC r
n
21. with May be done r r Shall be permitted, or Shall not
r r r r r