NFPA 99 Practice Test 2025 with Correct Questions and Answers – Medical Gas Systems

Rating
-
Sold
-
Pages
33
Grade
A
Uploaded on
12-10-2025
Written in
2025/2026

Download the NFPA 99 Practice Test 2025 with verified correct answers. Covers medical gas systems, alarm panels, oxygen piping, bulk gas storage, brazing, safety codes, and installation requirements for ASSE 6010 and healthcare compliance.

Show more Read less
Institution
Nfpa
Course
Nfpa











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Nfpa
Course
Nfpa

Document information

Uploaded on
October 12, 2025
Number of pages
33
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NFPA-99: PRACTICE TEST QUESTIONS
EXAM WITH CORRECT QUESTIONS
AND ANSWERS 2025

Under which of these conditions shall the instrument Air Reserve header cylinders be permitted


to be stored with the instrument air compressor?


A) the mechanical equipment room does not contain a boiler.


B) the medical air compressors are in the same room.


C) the only motor-driven machinery in the room is for instrument air equipment.


D) the room is secured with lockable doors. - CORRECT-ANSWERSC) The only motor-driven


machinery in the room is for the instrument air equipment


Riser valves are those valves located where?


A) adjacent to the main riser downstream of any zone valve.


B) anywhere in the lateral branches of the piping system.


C) in the mainline adjacent to the base of the riser.


D) in the riser adjacent to the mainline. - CORRECT-ANSWERSD) In the riser adjacent to the


main line


When is the initial pressure test conducted by the installer?

,A) after blowdown of the distribution piping.


B) after installation of alarm sensors.


C) before blowdown of distribution piping.


D) before installation of station rough in assembly. - CORRECT-ANSWERSA) After blow-down of


the distribution piping.


In those portions of systems intended to handle oxygen at pressure greater than 350 psi the


inter connecting hose shall not contain what materials?


A) brass.


B) copper


C) polymeric


D) stainless steel - CORRECT-ANSWERSC) Polymeric


The tool shown here allows the installer to mechanically limit the makeup depth of the fitting


to be brazed. Under what condition is this method permitted for the installation of medical gas


piping?


A) only on final line connectors.


B) only on vacuum systems.


C) where only B cup 5 brazing rod is used

,D) where the limited makeup depth is not less than minimum cut depth her ANSI / ASME


recommendations - CORRECT-ANSWERSD) Where the limited makeup depth is not less than


minimum cup depth current ANSI\ASME recommendation


What is the standard gauge pressure for nitrogen gas service?


A) 15 - 30


B) 50 - 55


C) 162 185


D) it varies with system type. - CORRECT-ANSWERSC) 50 - 55 psi


What is a NFPA 99 requirement for labeling of pipes in medical gas system?


A) color coding


B) fixed label with


C) label shall wrap completely around pipe.


D) reflective label - CORRECT-ANSWERSA) Color coding


A wireless communication device is employed in a medical gas or vacuum warning system. what


type of supervision is required for this device?


A) a visual indicator Shelby located in maintenance officer or engineering department.


B) this device shall be installed at the medical gas or vacuum source.


C) this device shall be located at nurses station.

, D) this device will be supervised such that failure communication shall initiate an alarm. -


CORRECT-ANSWERSD) This device will be supervised such that failure of communication shall


initate an alarm


In a facility where Medical Gas vacuum systems are present and the failure of such equipment


or systems is likely to cause any major injury or death to patients or caregivers this system shall


be designed to meet which category requirements?


A) 1


B) 2


C) 3


D) 4 - CORRECT-ANSWERSA) category 1


A faculty is in the planning stages of installing an emergency oxygen service connection (ESOC).


How many feet is the minimum amount of clearance required around this connection?


A) 1 foot


B) 3 feet


C) 5 feet


D) Clearance must be 1-1/2 times the width of the auxiliary. - CORRECT-ANSWERSB) 3 feet


Wooden rack for cylinder storage may be permitted under which conditions?


A) the wooden must be painted.
$13.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
frosty3

Get to know the seller

Seller avatar
frosty3 Howard Community College
View profile
Follow You need to be logged in order to follow users or courses
Sold
New on Stuvia
Member since
2 months
Number of followers
1
Documents
57
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions