100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

Oregon Construction Contractors CCB Test 400 Questions and answers Newest RATED A+ 2025/2026 WITH COMPLETE SOLUTION NEW!!

Rating
-
Sold
-
Pages
64
Grade
A+
Uploaded on
10-10-2025
Written in
2025/2026

Oregon Construction Contractors CCB Test 400 Questions and answers Newest RATED A+ 2025/2026 WITH COMPLETE SOLUTION NEW!!Oregon Construction Contractors CCB Test 400 Questions and answers Newest RATED A+ 2025/2026 WITH COMPLETE SOLUTION NEW!!Oregon Construction Contractors CCB Test 400 Questions and answers Newest RATED A+ 2025/2026 WITH COMPLETE SOLUTION NEW!!Oregon Construction Contractors CCB Test 400 Questions and answers Newest RATED A+ 2025/2026 WITH COMPLETE SOLUTION NEW!!Oregon Construction Contractors CCB Test 400 Questions and answers Newest RATED A+ 2025/2026 WITH COMPLETE SOLUTION NEW!!Oregon Construction Contractors CCB Test 400 Questions and answers Newest RATED A+ 2025/2026 WITH COMPLETE SOLUTION NEW!!

Show more Read less
Institution
Oregon Construction Contractors CCB
Course
Oregon Construction Contractors CCB











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Oregon Construction Contractors CCB
Course
Oregon Construction Contractors CCB

Document information

Uploaded on
October 10, 2025
Number of pages
64
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Oregon Construc on Contractors CCB Test 400
Ques ons and answers Newest RATED A+ 2025/2026
WITH COMPLETE SOLUTION NEW!!

A person who engages in a business or ac vity that involves construc on new water wells must
possess a license from the: - Ans Oregon Water Resource Department (OWRD)



True or False

Prompt billing and prompt collec ons make for a healthier cash flow. - Ans True



Oregon OSHA consultants WILL NOT: - Ans Issue cita ons or propose penal es for viola ons of
OSHA standards.



1) Ques ons to answer when preparing your project schedule include all of these except:



- All of these are ques ons to ask

- What equipment will be needed?

- How long will each task take to complete?

- What type of crew will be needed to complete the ac vity? - Ans - All of these are ques ons to
ask

- What equipment will be needed?

- How long will each task take to complete?

- What type of crew will be needed to complete the ac vity?



For No ce of Right Lien purpose, a commercial improvement is defined as: - Ans A structure
that is not used or intended for use as a residen al building

,I am the residen al original contractor and I provide labor and materials for the project. Who
do I need to give a no ce of Right to Lien to? - Ans Mortgagee



A quan ty survey is also referred to as a: - Ans Take Off



Tagout involves placing a warning tag: - Ans On an energy-isola on device



Other than Take Off, other common construc on es mate types include all, except: - Ans
Ballpark Es mates



True or False

An on-site of host employer is responsible for ensuring a safe place of employment for leased or
temporary workers. - Ans True



The state unemployment tax rate varies base on: - Ans The history of unemployment claims
against the employer.



Stop work order viola ons can result in: - Ans - Any of these could be the result of failure to
comply with a stop work order.

- Court ac on

- Permit or license revoca on

- Civil penal es



The ___________________ gives an overview of the project, deadlines, and general
requirements. - Ans Invita on to Bid



"Job Logic" refers to: - Ans The sequence of work

,True or False

Self-employment taxes apply to all forms of business en es. - Ans False



- Money earned and money spent are accounted for in the year they are received or paid,
respec vely. - Ans In the Cash Method



The Itemized Summary is the basis for: - Ans A complete and accurate es mate of project costs
and lists all major items of work in the order they are to be performed.



A major difference between the EIN and the BIN is: - Ans One is federal and one is state



Poor construc on and storage prac ces can result in _________________ inside the structure
walls. - Ans Molds and fungus



Builders now must use corrosion-resistance flashing in these specified loca ons, except: - Ans
Surrounding all interior bedroom doors.



Compliance with environmental regula ons can protect a contractor from:



- All of these are correct

- Private party lawsuits

- Criminal and civil penal es

- Liability claims - Ans - All of these are correct

- Private party lawsuits

- Criminal and civil penal es

- Liability claims

, Using the Quan ty Take-Off method for es ma ng, you begin by es ma ng the cost of
_________________ for each individual task. - Ans Labor and materials



Contractors must apply for permits through: - Ans Their local building department



A cost effec ve method for managing material costs and keeping inventory costs down is the: -
Ans JIT - Just In Time



These are materials prohibited form open burning in Oregon except for: - Ans Unpainted and
untreated scrap wood



An owner-seller may comply with the Homebuyers Protec on Act (HPA) by:



- Doing any of these

- Purchasing tle insurance that does not exclude filed or unfiled claims of lien,

- Obtaining lien waivers or releases

- Retaining at least 25% of the sales price in escrow - Ans - Doing any of these

- Purchasing tle insurance that does not exclude filed or unfiled claims of lien,

- Obtaining lien waivers or releases

- Retaining at least 25% of the sales price in escrow



What are the possible consequences that a contractor may face if he or she fails to provide the
informa on to the Owner About Construc on Liens when required?



- All of these are correct

- Contractor may be fined

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
STUVANA Phoenix University
View profile
Follow You need to be logged in order to follow users or courses
Sold
47
Member since
6 months
Number of followers
1
Documents
3670
Last sold
17 hours ago
STUVATE PRO -USA

3.0

5 reviews

5
1
4
0
3
3
2
0
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions