with 100% Verified Solutions
Which ESSP category addresses facilities and operations that do not completely
conform to deterministic QD criteria or meet the risk-based criteria in DESR 6055.09
Edition 1? - ANSWERS HSP
Which is NOT a common mistake when submitting an ESSP? - ANSWERS Sending the
ESSP to USATCES
Your facility does not have a lightening protection system (LPS). Which of these will you
have to submit? - ANSWERS Risk Assessment and command acceptance of the risk
Who is authorized to sign an ESSP transmittal memorandum? - ANSWERS Installation
Commander or designated representative
Which ESSP category addresses PES and ES that do not meet the deterministic QD
criteria, but do meet DDESB-approved, risk-based siting acceptance criteria? -
ANSWERS RBSB
Your installation is refurbishing an existing PES facility built in 1968. Do you need to
complete an ESSP? - ANSWERS Yes, and it requires DDESB approval.
As distance from the potential explosion site decreases, the potential for damage to an
exposed site from an explosion.... - ANSWERS increases.
Your installation is increasing the NEW for a storage site built in 1969 and storing a
hazard division that was not previously approved for that location. Do you need to
complete an ESSP? - ANSWERS Yes, and it requires DDESB approval.
Intraline distance (ILD) is the minimum distance permitted between... - ANSWERS two
operating buildings.
The purpose of an ESSP is to ensure safety, provide specifications, and... - ANSWERS
establish limits.
You must submit an ESSP for DDESB approval if the installation is... - ANSWERS
building an ES within an existing ESQD arc.
Failing to submit a successful ESSP may result in... - ANSWERS reduced operational
capacity.