1. 5S sort, set in order, shine, standard-
ize, sustain
2. 5 whys A technique in which you repeated-
ly ask the question "Why?" to help
peel away the layers of symptoms
that can lead to the root cause of a
problem
3. Criticality analysis allows organizations to Identify the most significant risks
4. Criticality analysis attempts to identify The likelihood of a risk occurring
5. Criteria for criticality analysis may include Safety, Environmental, and Produc-
tion consequences
6. The earliest asset lifecycle phase a criticality During the design phase
analysis may be performed is:
7. The ISO standard that includes criticality analy- ISO14224
sis is:
8. Reliability strategy development (RSD) is based RCM, PMO, FMEA
on three main techniques:
9. RSD relies upon two areas of competence: 1. Understanding of the differ-
ences between RCM, PMO, and
FMEA. 2. Identifying when and
where each technique should be
applied.
10. What does RSD stand for? reliability strategy development
11. There are many forms of RCM, PMO, and FMEA:
, CRL Exam Study
All of these derivates help perform
analyses cost effectively
12. Which of the following statements is true re- FMEA helps designers and engi-
garding FMEA? neers improve the reliability of as-
sets and systems to produce quality
1. FMEA helps designers and engineers improve products
the reliability of assets and systems to produce
quality products.
2. FMEA is universally applied to all new assets
during the design phase.
3. FMEA governance is defined in the ISO/TS
16949
13. What does FMEA stand for? Failure Mode and Effects Analysis
14. What does RCM stand for? Reliability Centered Maintenance
15. What does RCA stand for? Root cause analysis
16. A preventative/planned maintenance optimiza- Evaluating each PM task and elimi-
tion process focuses on: nating unnecessary tasks or waste-
ful activities
17. The Reliability Engineering for Maintenance Pinpoint potential areas for relia-
process is designed to: bility improvement
18. Uptime divided by Uptime + Downtime equals: Availability
19. MTBF means Mean Time Between Failures
20. The definition Uptime is: A measure of the time an asset is
working and available
, CRL Exam Study
21. Failure rate refers to the cost of a failure: FALSE
22. Root cause analysis is designed to elimi- causes of failure
nate_____
23. One of the most basic methods of root cause The 5 Why's
analysis is called
24. The first step in a root cause analysis is to Define the problem
25. Root cause analysis should be performed by A cross functional team
26. Root cause analysis is a continuous improve- TRUE
ment methodology
27. Capital projects are usually created to increase: Capacity
28. A test to determine compliance with specified A acceptance test
requirements is:
29. The term for stages involved in the manage- Lifecycle
ment of an asset is:
30. Investment planning for capital projects is con- Business needs analysis phase
ducted during this phase
31. Capital projects may be driven by regulatory re- TRUE
quirements for existing assets:
32. It is okay to buy a cheaper motor because you Yes
have to create a budget for the project?
33. You always have to buy the most expensive mo- FALSE
tor. True or false?