100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CEPSCI Exam |Questions with Correct Answers| Verified

Rating
-
Sold
-
Pages
5
Grade
A+
Uploaded on
01-10-2025
Written in
2025/2026

CEPSCI Exam |Questions with Correct Answers| Verified

Institution
CEPSCI
Course
CEPSCI









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CEPSCI
Course
CEPSCI

Document information

Uploaded on
October 1, 2025
Number of pages
5
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CEPSCI Exam |Questions with Correct Answers| Verified
Sediment control structures such as silt fence most commonly trap sediment by the
following means:


a. Slowing water to allow sediment particles to settle out.
b. Serving as a filter that traps sediment particles in the small openings.
c. Preventing on-site erosion.

d. Serving as obstacles for vehicular traffic to slow movement. - Answer✔✔a. Slowing water
to allow sediment particles to settle out.


PAM is a chemical that is added to turbulent runoff primarily to achieve the following:


a. Change the turbulent flow to laminar flow.
b. Cause flocculation that reduces sediment transport.
c. Make the water potable immediately.

d. Provide binding of seed to mulch so that vegetation can be established. - Answer✔✔b.
Cause flocculation that reduces sediment transport.


Energy dissipation is an important function for each of the following BMPs except:


a. ECBs
b. Mulches
c. Riprap

d. Construction entrance - Answer✔✔d. Construction entrance


Filter fabric inlet protection is the most appropriate BMP of choice in situations where the
flow rate is:


a. High (> 0.5 cfs)
b. Medium (~ 0.5 cfs)

, c. Low (< 0.5 cfs)

d. Frequent - Answer✔✔c. Low (< 0.5 cfs)


Which of the following would not file a Notice of Intent (NOI) prior to any land disturbing
activities?


a. Secondary Permittee
b. Utility Provider
c. Compliance Inspector

d. Primary Permittee - Answer✔✔c. Compliance Inspector


Final site stabilization is achieved when percent vegetative cover on all disturbed areas is at
least the following:


a. 65%
b. 70%
c. 80%

d. 90% - Answer✔✔b. 70%


The sediment control structure in the center right side of the photo above is a:


a. Rock-filter fabric inlet
b. Rock construction entrance
c. Rock ditch check

d. Rock spillway for a sediment trap - Answer✔✔d. Rock spillway for a sediment trap


Consider the following situation: You observe bulldozer tracks with dozer traveling parallel
to the contour. The statement that you would use in an inspection report about the
situation shown is most nearly.
$12.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
ExamsCentre
4.0
(2)

Get to know the seller

Seller avatar
ExamsCentre New Yo
View profile
Follow You need to be logged in order to follow users or courses
Sold
6
Member since
9 months
Number of followers
0
Documents
1711
Last sold
1 week ago

4.0

2 reviews

5
1
4
0
3
1
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions