CEPSCI Exam |Questions with Correct Answers| Verified

Rating
-
Sold
-
Pages
14
Grade
A+
Uploaded on
01-10-2025
Written in
2025/2026

CEPSCI Exam |Questions with Correct Answers| Verified

Institution
CEPSCI
Course
CEPSCI









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CEPSCI
Course
CEPSCI

Document information

Uploaded on
October 1, 2025
Number of pages
14
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CEPSCI Exam |Questions with Correct Answers| Verified
1972 clean water act - Answer✔✔Administered by the US environmental protection agency
(EPA) Created the NPDES



1987 - Answer✔✔Amendment to CWA CALLED WATER QUALITY ACT



NPDES in south carolina - Answer✔✔South Carolina is NPDES delegated state.



NPDES regulations are administered by - Answer✔✔SCDHEC



CGP authorizes - Answer✔✔stormwater discharges from construction sites



Who must obtain NPDES coverage - Answer✔✔land disturbing activities greater than or
equal to 1 acre
-land disturbance less than 1 ac within 1/2 miles of water body in SC costal zone



NPDES permits are issued to - Answer✔✔operator-person or company for a particular
discharge



primary permittee - Answer✔✔-has day to day operational control to ensure compliance
with SWPP
-typically the owner or developer



primary permittee responsibilites - Answer✔✔submit NOI, Preparation of the C_SWPPP



Secondary permittee - Answer✔✔individual lot owner or residential builder that conducts
land disturbing activity limited to an individual lot or group of lots as part of approved LCP of
development



contractors - Answer✔✔must on Contractor Certification- D-0437

, On-Site SWPPP - Answer✔✔SCDHEC CGP, NOI, NPDES coverage approval letter, Contractor
Certifications, Local Approvals, USACE approvals, Critical area permit(coast)



OS_SWPPP - Answer✔✔a copy of signed and certified SWPPP, NOI, and CGP coverage letter
from DHEC must be retained at site or electronically accessible



minor modification to ON-SWPPP - Answer✔✔minor modifications made directly in the
field,do not need approval by DHEC- additional BMP's, removal of disturbed areas



major modifications to OS-SWPPP - Answer✔✔must be made by qualified individual and
submitted to DHEC or appropriate delegated entity for approval



Phased plan requirement > 5 - Answer✔✔include a phased stormwater management plan
which identifies all BMP's and grading work conducted during a specific portion of the sites
construction sequence. Each phase identified on at least one separate plan sheet.



Phased plan requirement < 10 but > 5 acres - Answer✔✔at least two separate plan phases
are required - initial land disturbance phase - stabilization phase



Phased plan requirement ≥ 10 acres - Answer✔✔at least 3 separate plan phases are
required - initial land disturbance phase - construction phase - stabilization phase


All compliance inspection must include invesg. of, at a minimum of 5 of the following -
Answer✔✔1. areas of site disturbed by construction activity and areas used for storage of
materials exposed to precipitation
2. stormwater conveyance systems for evidence of sediment
3. BMP's identified in OS-SWPPP
4. Discharge location to investigate if sediment leaving site, or if such locations are
inaccessible, nearby downstream location if possible.
5. Where vehicles enter or exit site for evidence of off-site sediment tracking.
$12.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
ExamsCentre
4.0
(2)

Get to know the seller

Seller avatar
ExamsCentre New Yo
View profile
Follow You need to be logged in order to follow users or courses
Sold
6
Member since
9 months
Number of followers
0
Documents
1711
Last sold
1 week ago

4.0

2 reviews

5
1
4
0
3
1
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions