How many additional hours of training is required for AE
2
1.2, Enhanced Training?
What EPA radon zone is Radon Resistant Construction
1
required?
Who conducts the Preliminary for the Project Team? Provider
Which IECC Code is referenced as part of prescriptive
2004
Energy & Atmosphere requirements?
Which of the following is a required strategy under Dura-
3 feet of hard flooring at all entry ways
bility Management?
Building orientation should be considered early in the
orientation affects many aspects of design
design phase because:
Which of the following is an eflcient framing strategy in
Increased stud spacing
LEED for homes?
A good strategy to reduce construction waste is to: Create detailed framing documents and cut lists
Which document is used to verify air sealing and insula-
Thermal bypass checklist
tion?
What affects the Home Size Adjustment? Number of Bedrooms
in a large subdivision, half of the homes are targeted for
Silver and half of the homes are targeted for Gold certifi- 1/2 homes silver, 1/2 homes gold with 2 sample sets
cation levels. What sampling protocol must be followed?
How many registrations are required for a project with 3
3
adjacent low-rise multifamily buildings with 12 units each?
Which of the following is an important milestone of a
Pre-drywall Inspection
project?
A project team submits documentation to a Green rater for
Location and Linkages credit Basic Community Resources. Submit a CIR for the unlisted resource
The Green rater notices that one of the resources is not
, listed in the Rating System requirements for resources.
What can be done to earn the credit?
Which of the following is a major Durability Risk? Interior Moisture
To maximize points under WE 1.1 Rainwater harvesting,
irrigation and toilets
the storage system should be used for which applications?
A home is built on a previously developed lot. What is re-
quired to earn credit for Sustainable Sites credit "Minimize Develop a tree or plant preservation plan
Disturbed Area of Site?"
A project is installing solar panels. What input is needed
Reference Electric Load
for the Energy & Atmosphere credit Renewable Energy?
A channel with dense plantings used to manage stormwa-
Vegetated Swale
ter runoff is known as a:
For Existing infrastructure credit, what proximity must a
0.5 mi
project be to water and sewer service lines?
A project has maxed out points under the performance
pathway for its HERS Index. What else could the project do Insulate all hot water piping
to earn points in the Energy and Atmosphere category?
For Indoor Environmental Quality credit basic Outdoor Air
Ventilation, a project must be located in a climate with
4500
a fewer than infiltration degree days to be
exempt from this prerequisite?
To earn credit for permeable lot under Surface Water
Vegetated Swale
Management, a paved driveway can be directed to:
What is the minimum HERS index for climate zones 1-5? 85
Who is responsible for signing an accountability form? Responsible Party
What is the only additional role a Green Rater can play on
Energy rater
a project?