LDP -
Answer✅
Land Developing Projects - altering landscape for projects such as agriculture or housing ect.
Quiz_________________?
NPDES -
Answer✅
National Pollutant Discharge Elimination System
- section of the CWA (Clean Water Act) to permit stormwater discharges associated w
industrial activities PER permit
Quiz_________________?
CWA Penalty Types -
Answer✅
Adminstrative
Class I. Neglegent
Class II. Knowlingly = greater fines
Quiz_________________?
1
,What documents are required on site? -
Answer✅
- SWPPP
- CGP
- Site Map
- Drawings and Key
- All inspection reports
- Any amendments to SWPPP
Quiz_________________?
Who is the "operator"? Also the LRP. -
Answer✅
Usually the OWNER of the site, not the contractor, unless authorized by the owner to
general contractor to have day-to-day operational control!
Quiz_________________?
When do you need permit coverage? -
Answer✅
Required from start to end of project. "End" being the final vegetative/non-vegetative
(concrete) stabilization occuring.
For any project one acre or greater.
Quiz_________________?
Large Land Development -
Answer✅
-strips off all existing vegetation a.k.a site carving
-usually on hillsides and steep slopes
-installation of untilities that tear up large areas of land
2
, Quiz_________________?
Vertical Projects -
Answer✅
- Homebuilding, smaller residence construction projects
-usually multiple subcontractors
-requires lots of housekeeping = mass choas
Quiz_________________?
Bix Box Projects -
Answer✅
-commercial buildings
-mass grading and mass choas
-highly visible w/ fairly large footprint
Quiz_________________?
Linear Projects -
Answer✅
-roadways, utilities, and stream corridors
-long narrow sites and mass choas
-limites site access and continually changing (high activity)
Quiz_________________?
What is erosion? -
Answer✅
The process by which soil particle get displaced by the act of wind of water.
Quiz_________________?