LARE - SECTION 1 PRACTICE EXAM 2025/2026 QUESTIONS AND ANSWERS 100% PASS

Institution
LARE
Course
LARE











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
LARE
Course
LARE

Document information

Uploaded on
September 22, 2025
Number of pages
51
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

LARE - SECTION 1 PRACTICE EXAM
2025/2026 QUESTIONS AND ANSWERS
100% PASS



An owner is unsure of the best type of payment structure to adopt in their contract with a
contractor and requests that the contractor provide three different options for them to
evaluate. Of the following list, which would the contractor provide to the owner?
Choose three.
A. Unit price contract
B. Cost-plus contract
C. As-built contract
D. Lump sum contract

E. Boilerplate contract - ANS Unit price contract
Cost-plus contract
Lump sum contract


Which of the following parties has the ability to place a tax lien against a property?
A. Government
B. Landscape architect
C. Material supplier

D. General contractor - ANS Government


Which of the following would NOT be considered a potential use for as-built drawings?
A. Used to compare final built conditions to those in the record drawings


pg. 1 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED

,B. Used to determine liability in construction-related litigation
C. Used by a future party to make modifications, additions or alterations to a project site
D. Used to fabricate custom site elements as requested by the landscape architect -
ANS Used to fabricate custom site elements as requested by the landscape architect


A contractor is tasked with pouring a concrete driveway per the plans and performance
specifications supplied by a landscape architect. The work is completed to the landscape
architect's satisfaction with the exception of the broom finish on the concrete, which is sloppy
and unattractive. Of the options provided, which of the following actions would the contractor
most likely take?
A. Demolish the work and reinstall it per the landscape architect's verbal direction regarding
the broom finish
B. Stand by the work as performed and do nothing
C. Demolish the work and reinstall it because it does not meet the performance specification
D. Demolish the work and reinstall it because it does not meet the information provided in the
plans - ANS Stand by the work as performed and do nothing


The primary reason that a landscape architect should not give orders or direction directly to a
contractor's workers is that:
A. The workers may begin to follow the landscape architect's direction instead of the plans
B. The workers could misinterpret the direction and execute the requested work improperly
C. Doing so places undue liability on the landscape architect and can make them responsible for
any resulting cost overruns
D. The contractor can accuse the landscape architect of misfeasance in a court of law -
ANS Doing so places undue liability on the landscape architect and can make them
responsible for any resulting cost overruns


Which of the following answers correctly lists the order of project management activities
according to Ramroth in "Project Management
for Design Professionals"?
A. Defining, Planning, Directing, Coordinating, Monitoring, Learning B. Learning, Defining,
Planning, Directing. Coordinating, Monitoring C. Coordinating, Monitoring, Learning. Defining.
Planning, Directing



pg. 2 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED

,D. Coordinating, Monitoring, Defining, Planning, Directing. Learning - ANS Defining, Planning,
Directing, Coordinating, Monitoring, Learning


A project manager might use contingency planning for which of the following objectives?
A. To reduce the risk related to uncertainties or potential threats
B. To improve overall project performance
C. To increase staff morale and meet deadlines

D. To transfer financial losses to another, equally responsible, party - ANS To reduce the risk
related to uncertainties or potential threats


A landscape architect has commissioned a site survey for a project, but when the surveyor
sends the requested drawings to the landscape architect, it is missing basic information that
was omitted from the service contract. What should the landscape architect do? A. Request
that the surveyor include the missing information because it was basic and should have been
included as a best practice
B. Request that the surveyor include the missing information after signing a contract for
additional services
C. Take responsibility for the missing information and use the survey as-is

D. Go to the site and measure the missing information - ANS Request that the surveyor
include the missing information after signing a contract for additional services


7) A project manager is asked to determine the percentage completion of the construction
documents. Of the answers provided, which of the following actions would yield the most
accurate estimate?
A. Make an estimate based on the number of hours billed to the project
B. Make an estimate based on the number of drawings completed in relation to the list of
drawings required
C. Make an estimate based on self reporting from all members of the design team
D. Make an estimate based on the number of days remaining to the submittal deadline -
ANS Make an estimate based on the number of drawings completed in relation to the list of
drawings required


When acting as a subconsultant, a landscape architect is expected to:


pg. 3 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED

, A. Lead the overall design for the project in question
B. Coordinate with the prime consultant to produce work as described in the scope of services
section of the design contract
C. Liaise directly with the client regarding all design issues

D. Offer guidance to the contractor as needed - ANS Coordinate with the prime consultant to
produce work as described in the scope of services section of the design contract


A landscape architect is recording meeting minutes at a project-related meeting with numerous
attendees from a variety of firms and
organizations. Which of the following data should be recorded in those meeting minutes?


Choose all that apply.
A. The date, time and location of the meeting
B. The names, positions and firms/organizations of all attendees
C. All notable and relevant statements made by the attendees

D. The number of years that each attendee has been in their current position - ANS The date,
time and location of the meeting
The names, positions and firms/organizations of all attendees
All notable and relevant statements made by the attendees
The number of years that each attendee has been in their current position


Which of the following statements about the general conditions (contained in the project
manual) are TRUE?
Choose all that apply.
A. Contains "boilerplate" language that establishes the rights, authority and obligations of the
contracting parties
B. Are also referred to as "supplementary conditions"
C. Outlines the general rules under which a project will be built
D. Contains general information related to material finishes and product specifications -
ANS Contains "boilerplate" language that establishes the rights, authority and obligations of
the contracting parties



pg. 4 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TheStar Florida State University
View profile
Follow You need to be logged in order to follow users or courses
Sold
604
Member since
2 year
Number of followers
178
Documents
24050
Last sold
1 day ago
Stuvia Prodigy

Tested, Verified and Updated Study Materials with 100% Guaranteed Success.

3.8

121 reviews

5
58
4
21
3
21
2
4
1
17

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions