PJM Test Questions with complete solution 2025/2026 Which of the following balancing control modes is used by PJM under normal operations? - correct answer Tie-Line Bias Which of the following influences does PJM consider when performing their system load forecast? - correct answer Weather Conditions & Day of the Week All of the following are limits that must be submitted to PJM for generating units EXCEPT: 1. Eco Min 2. Eco Max 3. Emergency Max 4. Dynamic Instability - correct answer Dynamic Instability If PJM experienced an event that caused the loss of a 1,000 MW generator, which of the following would most likely provide the quickest impact to improve the undegenerating Area Control Area (ACE)? 1. Remedial Action Reserve 2. Synch Reserve 3. Non-Synch Reserve 4. Secondary Reserve - correct answer Synch Reserve Your system has experienced an event that caused the frequency to drop below 60.00 Hz, what would be the most likely event that occurred? - correct answer A generator on your system tripped offline

Show more Read less
Institution
PJM
Course
PJM











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
PJM
Course
PJM

Document information

Uploaded on
September 18, 2025
Number of pages
40
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • pjm test

Content preview

PJM Test Questions with complete
solution 2025/2026
Which of the following balancing control modes is used by PJM under normal
operations? - correct answer ✔Tie-Line Bias


Which of the following influences does PJM consider when performing their
system load forecast? - correct answer ✔Weather Conditions & Day of the
Week


All of the following are limits that must be submitted to PJM for generating
units EXCEPT:


1. Eco Min
2. Eco Max
3. Emergency Max
4. Dynamic Instability - correct answer ✔Dynamic Instability


If PJM experienced an event that caused the loss of a 1,000 MW generator,
which of the following would most likely provide the quickest impact to
improve the undegenerating Area Control Area (ACE)?


1. Remedial Action Reserve
2. Synch Reserve
3. Non-Synch Reserve
4. Secondary Reserve - correct answer ✔Synch Reserve

,Your system has experienced an event that caused the frequency to drop
below 60.00 Hz, what would be the most likely event that occurred? - correct
answer ✔A generator on your system tripped offline


How does the PJM dispatcher inform the Members of the PJM regulation
Requirements? - correct answer ✔All-Call


In order for your generator to quality to supply regulation in the PJM
Regulation market, it must be able to respond and attain its desired output
within how many minutes? - correct answer ✔5 minutes


Based on a generator capability curve, in order to maximize the MVAR output
of the generator, it may be necessary to: - correct answer ✔decrease the
MW output of the unit


PJM maintains a regulation quality standard which states that a generator
may be certified to provide regulation only after it achieves three consecutive
regulation test scores of at least - correct answer ✔75%


Which of the following would NOT be a cause for a sudden deviation in the
balancing area ACE?


1. incorrect interchange number
2. loss of a tie-line RTU
3. loss of internal load
4. loss of adjacent control area generation - correct answer ✔loss of
adjacent control area generation


The primary purpose for the balancing area to have Regulation is to correct
for: - correct answer ✔small deviations in load

,It is necessary for Generation Owner dispatchers to notify PJM of unplanned
unit outages: - correct answer ✔as soon as practicable


PJM should be made aware of any fuel shortage that a generator may
experience.


This information assists in analyzing the resources and reliably operating the
system. A heightened awareness is expected during: - correct answer
✔extreme hot or cold conditions


Generators are required to obtain PJM approval prior to removing a
generating unit from service.


The only exception is for: - correct answer ✔injury to personnel will be
prevented


Prior to removing a self-scheduled generator from service, the PJM member
must first - correct answer ✔give PJM the option to takeover the unit for the
market


When PJM experiences problems with their primary digital control signal, it
sometimes becomes necessary for companies with the capability, to switch to
the back-up signal.


This backup signal is known as: - correct answer ✔Analog control


When PJM sends cost signals to generators, to provide direction for
increasing or decreasing the facility output, this signal that is sent is known as:
- correct answer ✔Dispatch Rate

, Under normal operating conditions, what is the limit that will provide the lowest
output level of a generating unit? - correct answer ✔Eco Min


When PJM send out a cost signal to generators to adjust their output, the
generating personnel adjust the output of the unit base on the unit's - correct
answer ✔price or cost curve incremental


Which eSuite tool is used to maintain individual generator regulation data that
is submitted by PJM members? - correct answer ✔eMarket


PJM's ACE configuration is such, that when the ACE is positive (+), it
indicates - correct answer ✔too much generation


If a generator is self-scheduled, what is the minimum notification time required
in order for the MW output to be adjusted? - correct answer ✔20 minutes
prior to the change


When corrections are made for the time error and the system scheduled
frequency must be changed to implement the correction, how much is the
frequency scheduled adjusted by? - correct answer ✔+ /- 0.02 Hz


When PJM runs their Regulation test, how long do the tests normally run? -
correct answer ✔40 minutes


Your system has a 300 MW steam unit, but due to oil deliveries, the on-site
fuel supply is diminishing.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
flyhigher329 Liberty University
View profile
Follow You need to be logged in order to follow users or courses
Sold
343
Member since
2 year
Number of followers
175
Documents
16767
Last sold
3 days ago
STUDY GUIDES & ALL NURSING AND MORE EXAMS(RATED A+)

ARE YOU LOOKING FOR EXAMS!! MAY IT BE NURSING,EMT,REALTORS e.t.c WELCOME TO OUR SHOP FOR ALL YOU NEED TO PASS COZ WE ARE VERIFIED AND GUARANTEED TO PASS, DONT FORGET TO GIVE A REVIEW AFTER YOU HAVE PASSED THE EXAMS.........

3.8

57 reviews

5
24
4
10
3
14
2
4
1
5

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions