NICET Highway Construction
Inspector Level III Practice Exam
1Questions and Answers Latest
Edition.
During
/installation
/of
/traffic
/loops
/in
/the
/pavement,
/which /three /statements /apply /prior /to /and /during /the /installation /of /loop /wire? /(Choose /3).
a) /Do /not /allow /vehicular /traffic /over /an /open /saw /cut.
b) /Do /not /overlap /saw /cuts /at /the /corner.
c) /Thoroughly /clean /the /saw /cut /of /foreign /material.
d) /Use /a /plastic /sleeve /where /loop /wire /crosses /a /joint. /- /ANS /-
a) /Do /not /allow /vehicular /traffic /over /an /open /saw /cut.
c) /Thoroughly /clean /the /saw /cut /of /foreign /material.
d) /Use /a /plastic /sleeve /where /loop /wire /crosses /a /joint.
The /contractor /is /installing /a /culvert /with /a /12-
inch
/reinforced /concrete /pipe /( /outside /diameter /of /16.50 /inches) /from /Sta /10+00, /40 /feet /Left /to
/STA /10+00, /65 /feet /Right /on /4-inch /bedding /material. /The /12-
inch /RCP /outlet /is /to /be /installed /at /Sta /10+00, /40 /feet /Left /at /an /invert /elevation /of /652.50.
,If
/the
/conduit
/is /installed /at /a /1.40% /slope, /what /is /the /elevation /of /the /foundation /grade /at /Sta /10+00, /45
/feet /Right?
a) /652.04
b) /653.17
c) /653.36
d) /653.50 /- /ANS /-?
On
/the
/reservoir
/side
/of /
a
/dam,
/erosion /protection /against /wave /action /should /extend /up /the /slope /to /at /least /which /level?
a) /crest /of /dam
b) /maximum /water /elevation
c) /minimum /water /elevation
d) /two-thirds /the /height /of /the /dam /- /ANS /-b) /maximum /water /elevation
During
/stage
/construction
/while
, /installing /drainage, /the /contractor /must /complete /which /two /of /the /following /tasks? /(Choose
/two).
a) /Bulk /head /the /pipe /until /the /system /is /complete.
b) /Complete /the /entire /system /before /it /rains.
c) /Maintain /the /existing /drainage /system /until /the /new /system /is /functional.
d) /Provide /temporary /connections /as /needed /to /maintain /the /existing /system. /- /ANS /-
c) /Maintain /the /existing /drainage /system /until /the /new /system /is /functional.
d) /Provide /temporary /connections /as /needed /to /maintain /the /existing /system.
After
/flushing
/but /before /connecting /a /new /main /to /the /existing /system, /what /test /does /an /inspector /need
/to /verify /before /placing /the /main /into /service?
a) /bacteriological /testing
b) /cover /testing
c) /deflection /testing
d) /pressure /testing /- /ANS /-d) /pressure /testing
Which /three /types /of /inspections /are /completed /for /sign /structures? /(Choose /three).
a) /final /inspection
b) /interim /inspection
c) /initial /inspection
d) /routine /inspection /- /ANS /-b) /interim /inspection
c) /initial /inspection
d) /routine /inspection
Inspector Level III Practice Exam
1Questions and Answers Latest
Edition.
During
/installation
/of
/traffic
/loops
/in
/the
/pavement,
/which /three /statements /apply /prior /to /and /during /the /installation /of /loop /wire? /(Choose /3).
a) /Do /not /allow /vehicular /traffic /over /an /open /saw /cut.
b) /Do /not /overlap /saw /cuts /at /the /corner.
c) /Thoroughly /clean /the /saw /cut /of /foreign /material.
d) /Use /a /plastic /sleeve /where /loop /wire /crosses /a /joint. /- /ANS /-
a) /Do /not /allow /vehicular /traffic /over /an /open /saw /cut.
c) /Thoroughly /clean /the /saw /cut /of /foreign /material.
d) /Use /a /plastic /sleeve /where /loop /wire /crosses /a /joint.
The /contractor /is /installing /a /culvert /with /a /12-
inch
/reinforced /concrete /pipe /( /outside /diameter /of /16.50 /inches) /from /Sta /10+00, /40 /feet /Left /to
/STA /10+00, /65 /feet /Right /on /4-inch /bedding /material. /The /12-
inch /RCP /outlet /is /to /be /installed /at /Sta /10+00, /40 /feet /Left /at /an /invert /elevation /of /652.50.
,If
/the
/conduit
/is /installed /at /a /1.40% /slope, /what /is /the /elevation /of /the /foundation /grade /at /Sta /10+00, /45
/feet /Right?
a) /652.04
b) /653.17
c) /653.36
d) /653.50 /- /ANS /-?
On
/the
/reservoir
/side
/of /
a
/dam,
/erosion /protection /against /wave /action /should /extend /up /the /slope /to /at /least /which /level?
a) /crest /of /dam
b) /maximum /water /elevation
c) /minimum /water /elevation
d) /two-thirds /the /height /of /the /dam /- /ANS /-b) /maximum /water /elevation
During
/stage
/construction
/while
, /installing /drainage, /the /contractor /must /complete /which /two /of /the /following /tasks? /(Choose
/two).
a) /Bulk /head /the /pipe /until /the /system /is /complete.
b) /Complete /the /entire /system /before /it /rains.
c) /Maintain /the /existing /drainage /system /until /the /new /system /is /functional.
d) /Provide /temporary /connections /as /needed /to /maintain /the /existing /system. /- /ANS /-
c) /Maintain /the /existing /drainage /system /until /the /new /system /is /functional.
d) /Provide /temporary /connections /as /needed /to /maintain /the /existing /system.
After
/flushing
/but /before /connecting /a /new /main /to /the /existing /system, /what /test /does /an /inspector /need
/to /verify /before /placing /the /main /into /service?
a) /bacteriological /testing
b) /cover /testing
c) /deflection /testing
d) /pressure /testing /- /ANS /-d) /pressure /testing
Which /three /types /of /inspections /are /completed /for /sign /structures? /(Choose /three).
a) /final /inspection
b) /interim /inspection
c) /initial /inspection
d) /routine /inspection /- /ANS /-b) /interim /inspection
c) /initial /inspection
d) /routine /inspection