What is the primary contribution an owner makes to a construction project? -
Correct answer-Financial resources, the ability to obtain funding. (1)
What makes an effective project team? - Correct answer-People with
complementary skill sets, ample experience, passion and enthusiasm for the task,
strong work ethic, and the ability to assess and evaluate a process. (1)
Types of Development and Renovation - Correct answer-- Speculative
Development
- Build to Suit Development
- Energy Performance Contracting
- ADA Alterations (1)
©COPYRIGHT 2025, ALL RIGHTS RESERVE 1
,Speculative Development - Correct answer-Built without a commitment from a
user, but with the belief that a demand exists for the space and the space will be
rented within a reasonable time after the building is completed. (1)
Build to Suit Development - Correct answer-Design and construction of a building
to meet the specific needs of a user who is committed to the project. Can be owner
occupied or a long- term lease. (1)
Types of Renovation - Correct answer-- Rehabilitation
- Modernization
- Remodeling (1)
Rehabilitation - Correct answer-Restoration of a property to satisfactory condition
without changing the plan, form, or style of a structure. Corrects areas of deferred
maintenance. (1)
Modernization - Correct answer-Involves bringing a property into conformity with
changes in style. Requires replacing parts of the structure or mechanical equipment
with modern materials of the same kind without making major additions.
Improvements to satisfy codes, standards or market demand. (1)
©COPYRIGHT 2025, ALL RIGHTS RESERVE 2
,Remodeling - Correct answer-Changing the plan, form, or style of a structure to
correct functional or economic deficiencies. Can reestablish usefulness. Not to be
confused with alterations. (1)
Energy Performance Contracting - Correct answer-Adjust and refine existing
buildings to reduce operating expenses and energy costs for the owner. Can be
speculative or performance development. (1)
ADA Alterations - Correct answer-Based on ADA Act of 1990. Includes changes or
rearrangement in structural parts or elements and changes or rearrangement in the
plan configurations of walls and full height partitions. (1)
What is used to determine space requirements? - Correct answer-A needs
assessment and program of requirements. (1)
Needs Assessment - Correct answer-Analysis of space requirements of a specific
user. Can inform the creation of the program of requirements. (1)
Program of Requirements - Correct answer-Is divided into two sections: the
architectural program and the functional program. Helps create final design
documents. (1)
©COPYRIGHT 2025, ALL RIGHTS RESERVE 3
, Architectural Program - Correct answer-Created during the design phase to
accommodate the functional program. Establishes the size and general character of
the proposed building. Used to evaluate project documents. (1)
Functional Program - Correct answer-Involves creating written documents that
identify tangible needs a building must meet. Square footage requested in the
statement of need is compared to the space available in existing or proposed
buildings through a test fit. (1)
What are the two types of building design codes? - Correct answer-Building Codes
and Zoning Codes (1)
Zoning Codes - Correct answer-Control the use, height, and mass of a building.
Seeks to protect the health, safety, and welfare of the public. Address 3 primary
areas: district zoning for permitted uses, area height and bulk regulations, special
regulations. (1)
Building Codes - Correct answer-Promote general safety by regulating the design
and construction of the building's components. Each municipality adopts a model
building code and adds amendments to accommodate local conditions. (1)
What components are commonly included in construction contract documents? -
Correct answer-Working drawings, conditions of the contract, specifications (1)
©COPYRIGHT 2025, ALL RIGHTS RESERVE 4
(Chapters 1-8) Exam 2026 Questions and
Answers 100% Pass Guaranteed
What is the primary contribution an owner makes to a construction project? -
Correct answer-Financial resources, the ability to obtain funding. (1)
What makes an effective project team? - Correct answer-People with
complementary skill sets, ample experience, passion and enthusiasm for the task,
strong work ethic, and the ability to assess and evaluate a process. (1)
Types of Development and Renovation - Correct answer-- Speculative
Development
- Build to Suit Development
- Energy Performance Contracting
- ADA Alterations (1)
©COPYRIGHT 2025, ALL RIGHTS RESERVE 1
,Speculative Development - Correct answer-Built without a commitment from a
user, but with the belief that a demand exists for the space and the space will be
rented within a reasonable time after the building is completed. (1)
Build to Suit Development - Correct answer-Design and construction of a building
to meet the specific needs of a user who is committed to the project. Can be owner
occupied or a long- term lease. (1)
Types of Renovation - Correct answer-- Rehabilitation
- Modernization
- Remodeling (1)
Rehabilitation - Correct answer-Restoration of a property to satisfactory condition
without changing the plan, form, or style of a structure. Corrects areas of deferred
maintenance. (1)
Modernization - Correct answer-Involves bringing a property into conformity with
changes in style. Requires replacing parts of the structure or mechanical equipment
with modern materials of the same kind without making major additions.
Improvements to satisfy codes, standards or market demand. (1)
©COPYRIGHT 2025, ALL RIGHTS RESERVE 2
,Remodeling - Correct answer-Changing the plan, form, or style of a structure to
correct functional or economic deficiencies. Can reestablish usefulness. Not to be
confused with alterations. (1)
Energy Performance Contracting - Correct answer-Adjust and refine existing
buildings to reduce operating expenses and energy costs for the owner. Can be
speculative or performance development. (1)
ADA Alterations - Correct answer-Based on ADA Act of 1990. Includes changes or
rearrangement in structural parts or elements and changes or rearrangement in the
plan configurations of walls and full height partitions. (1)
What is used to determine space requirements? - Correct answer-A needs
assessment and program of requirements. (1)
Needs Assessment - Correct answer-Analysis of space requirements of a specific
user. Can inform the creation of the program of requirements. (1)
Program of Requirements - Correct answer-Is divided into two sections: the
architectural program and the functional program. Helps create final design
documents. (1)
©COPYRIGHT 2025, ALL RIGHTS RESERVE 3
, Architectural Program - Correct answer-Created during the design phase to
accommodate the functional program. Establishes the size and general character of
the proposed building. Used to evaluate project documents. (1)
Functional Program - Correct answer-Involves creating written documents that
identify tangible needs a building must meet. Square footage requested in the
statement of need is compared to the space available in existing or proposed
buildings through a test fit. (1)
What are the two types of building design codes? - Correct answer-Building Codes
and Zoning Codes (1)
Zoning Codes - Correct answer-Control the use, height, and mass of a building.
Seeks to protect the health, safety, and welfare of the public. Address 3 primary
areas: district zoning for permitted uses, area height and bulk regulations, special
regulations. (1)
Building Codes - Correct answer-Promote general safety by regulating the design
and construction of the building's components. Each municipality adopts a model
building code and adds amendments to accommodate local conditions. (1)
What components are commonly included in construction contract documents? -
Correct answer-Working drawings, conditions of the contract, specifications (1)