What is the part of Inspect and Adapt (I&A)?
PI System Demo
How frequently should the ART Backlog be reviewed?
Continuously
When does PI System Demo occur?
At the end of each PI
During Epic creation Lean Business Case can identify the impact on Sales and
which other areas?
Deployment
Product Managers are expected to collaborate in planning the amount of
upcoming Enabler work by establishing what?
Capacity Allocation
The WIP limit at Analyzing step of the ART Kanban is based on the overall
availability of Product Management, other subject matter experts, and the
capacity of which other roles?
System Architect
Which core competency in SAFe 6.0 has the purpose to help drive Built-In
Quality practices (including critical skills of Scrum, Kanban)?
Team and Technical Agility
What is the pattern for splitting Features into Stories?
Workflow Steps
There are total 10 pattern for splitting Features into Stories.
Workflow steps
,Business rule variations
Major effort
Simple/complex
Variations in data
Data entry methods
Defer system qualities
Operations
Use case scenarios
Break out a spike
Content of the Team Backlog are?
User Stories
Features in ART Backlogs can result from what?
Decomposing Epics or Capabilities
In a Portfolio Kanban System, at which stage is a Minimum Viable Product
(MVP) build and evaluated?
Implementing
Who owns features in SAFe?
Product Management
Which SAFe Core Competency describes a set of values and practices that
encourages individuals and the enterprise as a whole to continually increase
knowledge, competence, performance, and innovation?
Continuous Learning Culture
What is the primary purpose of PO Sync?
To assess progress of the PI and adjust scope and priority as needed
, The Release Train Engineer summarizes the team objectives into the ART PI
Objectives in a format suitable for management communication.
TRUE
Which role does ensure that the ART has the Vision and Backlog needed to
engage in PI Planning successfully?
Product Management
Which one is a part of Three Cs?
Card
What is one of the types of Enabler from below?
Infrastructure Enablers
Besides having an EPIC Owner, what else should an Epic have?
A Lean Business Case
What is one way Kanban are used in SAFe?
Manage Queue Length
Features are decomposed into what?
User Stories
What is the minimum requirement for a Feature?
Name, benefit hypothesis and acceptance criteria
How does value at the ART Level define?
By Features
Three Cs are used for what?
Writing good Stories
What is enabled by Continuous Delivery Pipeline?
New functionality delivered more frequently
Which cycle is embraced by the Lean startup movement?
ANSWERS (100% CORRECT) | LATEST EXAM UPDATE
What is the part of Inspect and Adapt (I&A)?
PI System Demo
How frequently should the ART Backlog be reviewed?
Continuously
When does PI System Demo occur?
At the end of each PI
During Epic creation Lean Business Case can identify the impact on Sales and
which other areas?
Deployment
Product Managers are expected to collaborate in planning the amount of
upcoming Enabler work by establishing what?
Capacity Allocation
The WIP limit at Analyzing step of the ART Kanban is based on the overall
availability of Product Management, other subject matter experts, and the
capacity of which other roles?
System Architect
Which core competency in SAFe 6.0 has the purpose to help drive Built-In
Quality practices (including critical skills of Scrum, Kanban)?
Team and Technical Agility
What is the pattern for splitting Features into Stories?
Workflow Steps
There are total 10 pattern for splitting Features into Stories.
Workflow steps
,Business rule variations
Major effort
Simple/complex
Variations in data
Data entry methods
Defer system qualities
Operations
Use case scenarios
Break out a spike
Content of the Team Backlog are?
User Stories
Features in ART Backlogs can result from what?
Decomposing Epics or Capabilities
In a Portfolio Kanban System, at which stage is a Minimum Viable Product
(MVP) build and evaluated?
Implementing
Who owns features in SAFe?
Product Management
Which SAFe Core Competency describes a set of values and practices that
encourages individuals and the enterprise as a whole to continually increase
knowledge, competence, performance, and innovation?
Continuous Learning Culture
What is the primary purpose of PO Sync?
To assess progress of the PI and adjust scope and priority as needed
, The Release Train Engineer summarizes the team objectives into the ART PI
Objectives in a format suitable for management communication.
TRUE
Which role does ensure that the ART has the Vision and Backlog needed to
engage in PI Planning successfully?
Product Management
Which one is a part of Three Cs?
Card
What is one of the types of Enabler from below?
Infrastructure Enablers
Besides having an EPIC Owner, what else should an Epic have?
A Lean Business Case
What is one way Kanban are used in SAFe?
Manage Queue Length
Features are decomposed into what?
User Stories
What is the minimum requirement for a Feature?
Name, benefit hypothesis and acceptance criteria
How does value at the ART Level define?
By Features
Three Cs are used for what?
Writing good Stories
What is enabled by Continuous Delivery Pipeline?
New functionality delivered more frequently
Which cycle is embraced by the Lean startup movement?