1|Page
FDOT EARTHWORK Exam Questions and
Answers Graded A+ 100% Verified
Basics covered in Level 1
Ans: Nuclear Testing
Speedy Moisture
Report Forms
Earthwork has to do with the roadway in what way?
Ans: Earthwork is the excavation and placement of soils and materials
supporting the proposed roadway.
In Earthwork what is a lift?
Ans: 6" of compacted depth at full width
In Earthwork what is a Lot?
,2|Page
Ans: A lot is 1 lift at 500 ft or within compacted area. Isolated compaction
operations are separate lots.
Sampling at the roadway is done for
Ans: Done for base, sub grade, and embankment.
Sampling is determined how
Ans: generated with random numbers usually by a Verification Inspector
What is important about sampling at the roadway
Ans: Minimum of three representative sample combined.
What is LIMS?
Ans: Laboratory Info Management System
, 3|Page
The proctor theory is when compaction is achieved how
FDOT EARTHWORK Exam Questions and
Answers Graded A+ 100% Verified
Basics covered in Level 1
Ans: Nuclear Testing
Speedy Moisture
Report Forms
Earthwork has to do with the roadway in what way?
Ans: Earthwork is the excavation and placement of soils and materials
supporting the proposed roadway.
In Earthwork what is a lift?
Ans: 6" of compacted depth at full width
In Earthwork what is a Lot?
,2|Page
Ans: A lot is 1 lift at 500 ft or within compacted area. Isolated compaction
operations are separate lots.
Sampling at the roadway is done for
Ans: Done for base, sub grade, and embankment.
Sampling is determined how
Ans: generated with random numbers usually by a Verification Inspector
What is important about sampling at the roadway
Ans: Minimum of three representative sample combined.
What is LIMS?
Ans: Laboratory Info Management System
, 3|Page
The proctor theory is when compaction is achieved how