FDOT EARTHWORK LEVEL 1 Exam
Questions and Detailed Verified Answers
Graded A+ 100% Verified
A job guide schedule is - Correct Answer-project specific
The material identification number for embankment in the laboratory is - Correct
Answer-004L
The material identification number for embankment in the field is - Correct
Answer-004F
The material identification number for base is - Correct Answer-030
PP is short for - Correct Answer-project personel
,Sampling in the field it is important to - Correct Answer-sample each type of
material and have enough for a representative sample
When to secure samples - Correct Answer-After material is placed but before
compaction effort is applied
Sample transmittal card the source uses what code for the jobsite - Correct
Answer-08
For material description the minimum is always - Correct Answer-Color and
texture
On sample bags be sure to put - Correct Answer-Project #
Sample #
Location
What is the document that itemizes the minimum requirements for sampling and
testing? - Correct Answer-Sampling, testing, reporting guide
, Unit weight is - Correct Answer-the weight of a material occupying a volume
Basics covered in Level 1 - Correct Answer-Nuclear Testing
Speedy Moisture
Report Forms
Earthwork has to do with the roadway in what way? - Correct Answer-Earthwork
is the excavation and placement of soils and materials supporting the proposed
roadway.
In Earthwork what is a lift? - Correct Answer-6" of compacted depth at full width
In Earthwork what is a Lot? - Correct Answer-A lot is 1 lift at 500 ft or within
compacted area. Isolated compaction operations are separate lots.
Sampling at the roadway is done for - Correct Answer-Done for base, sub grade,
and embankment.
Questions and Detailed Verified Answers
Graded A+ 100% Verified
A job guide schedule is - Correct Answer-project specific
The material identification number for embankment in the laboratory is - Correct
Answer-004L
The material identification number for embankment in the field is - Correct
Answer-004F
The material identification number for base is - Correct Answer-030
PP is short for - Correct Answer-project personel
,Sampling in the field it is important to - Correct Answer-sample each type of
material and have enough for a representative sample
When to secure samples - Correct Answer-After material is placed but before
compaction effort is applied
Sample transmittal card the source uses what code for the jobsite - Correct
Answer-08
For material description the minimum is always - Correct Answer-Color and
texture
On sample bags be sure to put - Correct Answer-Project #
Sample #
Location
What is the document that itemizes the minimum requirements for sampling and
testing? - Correct Answer-Sampling, testing, reporting guide
, Unit weight is - Correct Answer-the weight of a material occupying a volume
Basics covered in Level 1 - Correct Answer-Nuclear Testing
Speedy Moisture
Report Forms
Earthwork has to do with the roadway in what way? - Correct Answer-Earthwork
is the excavation and placement of soils and materials supporting the proposed
roadway.
In Earthwork what is a lift? - Correct Answer-6" of compacted depth at full width
In Earthwork what is a Lot? - Correct Answer-A lot is 1 lift at 500 ft or within
compacted area. Isolated compaction operations are separate lots.
Sampling at the roadway is done for - Correct Answer-Done for base, sub grade,
and embankment.