What is the standard lot size for FC-5? - ✔✔✔ Correct
Answer > Always 2000 tons
What is the formula to determine the core location? - ✔✔✔
Correct Answer > 2000 x spread rate x 9 / width x
tonnage of the core = feet from starting station
What are the key components in a pre-paving conferences? -
✔✔✔ Correct Answer > Key Personnel (Paving
superintendent)
Contractor Input
Agency Input
QC Plan Review
Discuss more specific key topics or issues
,Meeting Minutes
Action items (what to do in situations, who to call)
Where do you find approved tack products? - ✔✔✔ Correct
Answer > On the FDOT Approved products list (APL)
If there is a rolling straight edge deficiency found on the friction
course layer the contractor and the engineer can elect to take a
no pay instead of remove and replace. That formula is - ✔✔✔
Correct Answer > length of deficiency (+50 ft both sides)
x width x depth of layer
What is the minimum amount of RAP in a mix - ✔✔✔
Correct Answer > Maximum 20% by weight of total
aggregate
During night what is the tack you usually use? - ✔✔✔
Correct Answer > PG 52-28 or an approved emulsion
What tack an you use during the day? - ✔✔✔ Correct
, Answer > Any kind of tack
Questions and Detailed Verified Answers
Graded A+ 100% Verified
What is the standard lot size for FC-5? - ✔✔✔ Correct
Answer > Always 2000 tons
What is the formula to determine the core location? - ✔✔✔
Correct Answer > 2000 x spread rate x 9 / width x
tonnage of the core = feet from starting station
What are the key components in a pre-paving conferences? -
✔✔✔ Correct Answer > Key Personnel (Paving
superintendent)
Contractor Input
Agency Input
QC Plan Review
Discuss more specific key topics or issues
,Meeting Minutes
Action items (what to do in situations, who to call)
Where do you find approved tack products? - ✔✔✔ Correct
Answer > On the FDOT Approved products list (APL)
If there is a rolling straight edge deficiency found on the friction
course layer the contractor and the engineer can elect to take a
no pay instead of remove and replace. That formula is - ✔✔✔
Correct Answer > length of deficiency (+50 ft both sides)
x width x depth of layer
What is the minimum amount of RAP in a mix - ✔✔✔
Correct Answer > Maximum 20% by weight of total
aggregate
During night what is the tack you usually use? - ✔✔✔
Correct Answer > PG 52-28 or an approved emulsion
What tack an you use during the day? - ✔✔✔ Correct
, Answer > Any kind of tack