100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CTS Exam Prep 2026 Questions and Answers 100% Pass Guaranteed

Rating
-
Sold
-
Pages
37
Grade
A+
Uploaded on
04-09-2025
Written in
2025/2026

CTS Exam Prep 2026 Questions and Answers 100% Pass Guaranteed

Institution
Avixa CTS
Course
Avixa CTS











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Avixa CTS
Course
Avixa CTS

Document information

Uploaded on
September 4, 2025
Number of pages
37
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CTS Exam Prep 2026 Questions and
Answers 100% Pass Guaranteed

What are the four teams that comprise the overall Project Team? - Correct answer-

Owner, Design, Installation, and Management

Who would belong to the Design team? - Correct answer-Anyone with Consultant

in their title except the moving consultant

Which groups make up the Management Team? - Correct answer-Developer,

Construction Manager, and Building Management Agency

The End-User, Facility Manager and Building Committee comprise which team

within the Project Team? - Correct answer-Owner

Which group represent the generic roles that are important to the Project process? -

Correct answer-Project Managers, Designers and Installers

Which project characteristics must be considered in order to determine which

method is best suited for a particular project? - Correct answer-Schedule, Size,

Type, Complexity, and Procurement Requirements



©COPYRIGHT 2025, ALL RIGHTS RESERVE 1

,What is an important aspect of funding that has a direct impact on the project

process and design/installation? - Correct answer-Technical Support Funding

Whether a construction project is large or small, which milestones must be

achieved in a typical schedule? - Correct answer-Programming, Building Design,

AV Bid, and Move-In

What type of project is a typical Consultant-Led Design-Bid-Build contract

structure good for? - Correct answer-Long term projects with extended project

cycles

What is the risk in using an OFE/Integrator Installed contract structure? - Correct

answer-System and infrastructure design and facility functionality may suffer

What are some of the important project scope and size considerations in selecting

an AV provider? - Correct answer-Financial Stability, Current Workload, and

Company Credentials

What type of document typically includes Project Size Requirements, Corporate

Profile, Team Personnel, and Warranty Response Time? - Correct answer-RFQ

a significant difference between the Two-Envelope Bid

Method and the Qualifications- Based Selection Method? - Correct answer-

Negotiate with the highest ranking firm to finalize the contract


©COPYRIGHT 2025, ALL RIGHTS RESERVE 2

,What is one of the disadvantages of contracting the AV integrator to the electrical

subcontractor? - Correct answer-More layers of responsibility and communication

When conducting a complete project bid process, what milestone follows the

issuing of the RFP? - Correct answer-Pre-Bid Meeting

Under what circumstances would you likely use an A305-1986 form? - Correct

answer-Scoring responses to an RFQ

What is the ideal way to contract an AV integrator? - Correct answer-Directly to

the Owner

The process of identifying the activities that end-users need to perform, and

developing the functional descriptions of your systems is referred to as:? - Correct

answer-Needs Analysis

What is the main task of the third Step of the Program Phase of a Project? - Correct

answer-Conducting program meetings

What should be included in the written Program Report? - Correct answer-...A

conceptual and functional system description

The more accurate means to estimate dimensions of a commercial space during a

site inspection would be to? - Correct answer-Count Ceiling Tiles in a drop tile

instalation

©COPYRIGHT 2025, ALL RIGHTS RESERVE 3

, A client requires a new boardroom. The sales person and engineer are sent to the

premises to measure the facility and talk to the client. At this stage they should be

performing a _ - Correct answer-Needs Analysis

Sightlines for audience viewing in a given presentation space can be improved by:

- Correct answer-Providing a sloped, or stepped, seating arrangement

After presenting a proposal, what is the correct plan of action for following up with

the client? - Correct answer-Regularly, until a decision is made

AV professionals determine the end user's needs by examining three things: the

required applications, the tasks, and the: - Correct answer-Functions to support the

applications

When working with a client to design an AV solution for a new conference center,

the client requests a detailed budget for the equipment and installation. What phase

is the project in? - Correct answer-Design phase

The HDTV aspect ratio is equal to which of the following? - Correct answer-1.78:1

Please select the appropriate resolution for SXGA. - Correct answer-1280 x 1024

The Brightness control adjusts which level? - Correct answer-Black Level




©COPYRIGHT 2025, ALL RIGHTS RESERVE 4

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EmillyCharlotte Howard Community College
View profile
Follow You need to be logged in order to follow users or courses
Sold
95
Member since
1 year
Number of followers
4
Documents
11950
Last sold
18 hours ago
ALL-MAJOR.

On this page, you find all documents, package deals, and flashcards offered by seller Emilly Charlotte.

3.6

20 reviews

5
7
4
6
3
2
2
2
1
3

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions