CTS Exam Prep 2026 Questions and
Answers 100% Pass Guaranteed
What are the four teams that comprise the overall Project Team? - Correct answer-
Owner, Design, Installation, and Management
Who would belong to the Design team? - Correct answer-Anyone with Consultant
in their title except the moving consultant
Which groups make up the Management Team? - Correct answer-Developer,
Construction Manager, and Building Management Agency
The End-User, Facility Manager and Building Committee comprise which team
within the Project Team? - Correct answer-Owner
Which group represent the generic roles that are important to the Project process? -
Correct answer-Project Managers, Designers and Installers
Which project characteristics must be considered in order to determine which
method is best suited for a particular project? - Correct answer-Schedule, Size,
Type, Complexity, and Procurement Requirements
©COPYRIGHT 2025, ALL RIGHTS RESERVE 1
,What is an important aspect of funding that has a direct impact on the project
process and design/installation? - Correct answer-Technical Support Funding
Whether a construction project is large or small, which milestones must be
achieved in a typical schedule? - Correct answer-Programming, Building Design,
AV Bid, and Move-In
What type of project is a typical Consultant-Led Design-Bid-Build contract
structure good for? - Correct answer-Long term projects with extended project
cycles
What is the risk in using an OFE/Integrator Installed contract structure? - Correct
answer-System and infrastructure design and facility functionality may suffer
What are some of the important project scope and size considerations in selecting
an AV provider? - Correct answer-Financial Stability, Current Workload, and
Company Credentials
What type of document typically includes Project Size Requirements, Corporate
Profile, Team Personnel, and Warranty Response Time? - Correct answer-RFQ
a significant difference between the Two-Envelope Bid
Method and the Qualifications- Based Selection Method? - Correct answer-
Negotiate with the highest ranking firm to finalize the contract
©COPYRIGHT 2025, ALL RIGHTS RESERVE 2
,What is one of the disadvantages of contracting the AV integrator to the electrical
subcontractor? - Correct answer-More layers of responsibility and communication
When conducting a complete project bid process, what milestone follows the
issuing of the RFP? - Correct answer-Pre-Bid Meeting
Under what circumstances would you likely use an A305-1986 form? - Correct
answer-Scoring responses to an RFQ
What is the ideal way to contract an AV integrator? - Correct answer-Directly to
the Owner
The process of identifying the activities that end-users need to perform, and
developing the functional descriptions of your systems is referred to as:? - Correct
answer-Needs Analysis
What is the main task of the third Step of the Program Phase of a Project? - Correct
answer-Conducting program meetings
What should be included in the written Program Report? - Correct answer-...A
conceptual and functional system description
The more accurate means to estimate dimensions of a commercial space during a
site inspection would be to? - Correct answer-Count Ceiling Tiles in a drop tile
instalation
©COPYRIGHT 2025, ALL RIGHTS RESERVE 3
, A client requires a new boardroom. The sales person and engineer are sent to the
premises to measure the facility and talk to the client. At this stage they should be
performing a _ - Correct answer-Needs Analysis
Sightlines for audience viewing in a given presentation space can be improved by:
- Correct answer-Providing a sloped, or stepped, seating arrangement
After presenting a proposal, what is the correct plan of action for following up with
the client? - Correct answer-Regularly, until a decision is made
AV professionals determine the end user's needs by examining three things: the
required applications, the tasks, and the: - Correct answer-Functions to support the
applications
When working with a client to design an AV solution for a new conference center,
the client requests a detailed budget for the equipment and installation. What phase
is the project in? - Correct answer-Design phase
The HDTV aspect ratio is equal to which of the following? - Correct answer-1.78:1
Please select the appropriate resolution for SXGA. - Correct answer-1280 x 1024
The Brightness control adjusts which level? - Correct answer-Black Level
©COPYRIGHT 2025, ALL RIGHTS RESERVE 4
Answers 100% Pass Guaranteed
What are the four teams that comprise the overall Project Team? - Correct answer-
Owner, Design, Installation, and Management
Who would belong to the Design team? - Correct answer-Anyone with Consultant
in their title except the moving consultant
Which groups make up the Management Team? - Correct answer-Developer,
Construction Manager, and Building Management Agency
The End-User, Facility Manager and Building Committee comprise which team
within the Project Team? - Correct answer-Owner
Which group represent the generic roles that are important to the Project process? -
Correct answer-Project Managers, Designers and Installers
Which project characteristics must be considered in order to determine which
method is best suited for a particular project? - Correct answer-Schedule, Size,
Type, Complexity, and Procurement Requirements
©COPYRIGHT 2025, ALL RIGHTS RESERVE 1
,What is an important aspect of funding that has a direct impact on the project
process and design/installation? - Correct answer-Technical Support Funding
Whether a construction project is large or small, which milestones must be
achieved in a typical schedule? - Correct answer-Programming, Building Design,
AV Bid, and Move-In
What type of project is a typical Consultant-Led Design-Bid-Build contract
structure good for? - Correct answer-Long term projects with extended project
cycles
What is the risk in using an OFE/Integrator Installed contract structure? - Correct
answer-System and infrastructure design and facility functionality may suffer
What are some of the important project scope and size considerations in selecting
an AV provider? - Correct answer-Financial Stability, Current Workload, and
Company Credentials
What type of document typically includes Project Size Requirements, Corporate
Profile, Team Personnel, and Warranty Response Time? - Correct answer-RFQ
a significant difference between the Two-Envelope Bid
Method and the Qualifications- Based Selection Method? - Correct answer-
Negotiate with the highest ranking firm to finalize the contract
©COPYRIGHT 2025, ALL RIGHTS RESERVE 2
,What is one of the disadvantages of contracting the AV integrator to the electrical
subcontractor? - Correct answer-More layers of responsibility and communication
When conducting a complete project bid process, what milestone follows the
issuing of the RFP? - Correct answer-Pre-Bid Meeting
Under what circumstances would you likely use an A305-1986 form? - Correct
answer-Scoring responses to an RFQ
What is the ideal way to contract an AV integrator? - Correct answer-Directly to
the Owner
The process of identifying the activities that end-users need to perform, and
developing the functional descriptions of your systems is referred to as:? - Correct
answer-Needs Analysis
What is the main task of the third Step of the Program Phase of a Project? - Correct
answer-Conducting program meetings
What should be included in the written Program Report? - Correct answer-...A
conceptual and functional system description
The more accurate means to estimate dimensions of a commercial space during a
site inspection would be to? - Correct answer-Count Ceiling Tiles in a drop tile
instalation
©COPYRIGHT 2025, ALL RIGHTS RESERVE 3
, A client requires a new boardroom. The sales person and engineer are sent to the
premises to measure the facility and talk to the client. At this stage they should be
performing a _ - Correct answer-Needs Analysis
Sightlines for audience viewing in a given presentation space can be improved by:
- Correct answer-Providing a sloped, or stepped, seating arrangement
After presenting a proposal, what is the correct plan of action for following up with
the client? - Correct answer-Regularly, until a decision is made
AV professionals determine the end user's needs by examining three things: the
required applications, the tasks, and the: - Correct answer-Functions to support the
applications
When working with a client to design an AV solution for a new conference center,
the client requests a detailed budget for the equipment and installation. What phase
is the project in? - Correct answer-Design phase
The HDTV aspect ratio is equal to which of the following? - Correct answer-1.78:1
Please select the appropriate resolution for SXGA. - Correct answer-1280 x 1024
The Brightness control adjusts which level? - Correct answer-Black Level