100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

2015 IRC BUILDING INSPECTOR EXAM QUESTIONS WITH CORRECT ANSWERS 2025

Rating
-
Sold
-
Pages
19
Grade
A+
Uploaded on
30-08-2025
Written in
2025/2026

2015 IRC BUILDING INSPECTOR EXAM QUESTIONS WITH CORRECT ANSWERS 2025

Institution
BUILDING INSPECTOR
Course
BUILDING INSPECTOR










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
BUILDING INSPECTOR
Course
BUILDING INSPECTOR

Document information

Uploaded on
August 30, 2025
Number of pages
19
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

2015 IRC BUILDING INSPECTOR EXAM
QUESTIONS WITH CORRECT ANSWERS 2025

Where a referenced code or standard includes subject matter that is within the scope of the IRC, the pro
visions of the shall take precedence. - CORRECT ANSWER -IRC



2015 IRCTSection R102.4.2



An alternative material or method shall be approved where the proposed design is and complies
with the of the code. - CORRECT ANSWER -satisfactory; intent



2015 IRCTSection R104.11



Compliance with the specific -
based provisions of the International Codes in lieu of specific requirements of the IRC shall be permitted
as an alternative. - CORRECT ANSWER -performance



2015 IRCTSection R104.11



ATpermit is not required for the replacement of branch circuit overcurrent devices (breakers) of the requi
red capacity in the same location (within a panel). - CORRECT ANSWER -True



2015 IRCTSection R105.2



Where equipment replacements and repairs must be performed in an emergency situation, the permit a
pplication shall be submitted within the business day. - CORRECT ANSWER -next working



(... to the building official.)



2015 IRCTSection R105.2.1

,An application for a permit for any proposed work shall be deemed to have been abandoned days
after the date of filing. -TCORRECT ANSWER -180



(180 days also applies to extensions.)



2015 IRCTSection R105.3.2



Before issuing a permit, the building official is to examine or cause to be examined buildings, struc
tures and sites for which an application has been filed. - CORRECT ANSWER -authorized



2015 IRCTSection R105.9



When the buildingTofficial issues a permit, the construction documents shall be approved in writing or by
a stamp which states . - CORRECT ANSWER -
REVIEWED FOR CODE COMPLIANCE



2015 IRCTSection R106.3.1



Final inspection shall be made after the permitted work is and prior to .-
CORRECT ANSWER -complete; occupancy



2015 IRCTSection R109.1.6



If located in a flood hazard area, the documentation of elevations required in Section R322.1.10 shall be s
ubmitted to the building official prior to the inspection. - CORRECT ANSWER -final



2015 IRCTSection R109.1.6.1



Signifies access that requires the removal of an access panel or similar removable obstruction. -
CORRECT ANSWER -Accessible

, (Readily Accessible signifies access without the necessity for removing a panel or similar obstruction.)



2015 IRCTSection R202



ATfinished or unfinished area, notTconsidered a story, where the occupiable space is enclosed by the roof
assembly above and the floor-ceiling assembly below is a . - CORRECT ANSWER -habitable attic



(Other conditions relating to the occupiable floor area must also be met.)



2015 IRCTSection R202



Hot Water is water at a temperature greater than or equal to °F. - CORRECT ANSWER -110



2015 IRCTSection R202



A wall supporting any vertical load in addition to its own weight is a - wall. -
CORRECT ANSWER -load-bearing



2015 IRCTSection R202



WhatTis the minimum uniformly distributed live load for habitable attics and attics served with fixed stair
s? - CORRECT ANSWER -30 pounds per square foot



(Review of tables will be useful as knowledge of many tables is necessary for the exam.)



2015 IRCTTable R301.5



Wood structural panels with a minimum thickness of inch and a maximum span of feet shall
be permitted for opening protection in windborne debris regions. -TCORRECT ANSWER -7/16; 8

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NurseCelestine Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
103
Member since
1 year
Number of followers
27
Documents
4842
Last sold
1 week ago
Nurse Celestine Study Hub

Welcome! I’m Nurse Celestine, your go-to source for nursing test banks, solution manuals, and exam prep materials. My uploads cover trusted textbooks from top nursing programs — perfect for NCLEX prep, pharmacology, anatomy, and clinical courses. Study smarter, not harder!

4.4

311 reviews

5
202
4
40
3
57
2
5
1
7

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions