UPDATED VERSION QUESTIONS AND VERIFIED
CORRECT ANSWERS JUST RELEASED
Who is responsible for fire alarm system and testing and maintenance? -
answer>>>Property owner
In a protected premises with a 40 foot long by 15 foot wide room having a smooth
ceiling, what is the minimum quantity of smoke detectors that shall be required? -
answer>>>2 smoke detectors
A meter will be used to measure a horn strobe circuit current draw. Which of the
following statements is correct? - answer>>>The meter should be connected in series
with the circuit; it must be located before the first device(horn or strobe). ?
Which plans include a fire detection system details? - answer>>>electrical
Wall-mounted audible signal appliances shall be mounted how many inches below
finished ceiling? - answer>>>6 inches minimum
A Crew member has a suspected leg fracture. Before moving the crew member, what is
the recommended first step I'm treating the injury? - answer>>>Immobilize the leg
How often shall alarm notification appliances be tested? - answer>>>Every 12 months
, We're the outgoing and return conductors enter or exit notification of clients, the
conductors are permitted to run in the same cable assembly for up to which maximum
distance? - answer>>>10 feet?
Which part requires special handling or disposal? - answer>>>lead acid batteries
What is the minimum acceptable size of conductors for multi conductor cables? -
answer>>>26 AWG
Which type of detector is recommended for protecting atriums and similar open spaces?
- answer>>>projected beam-type
Which type of fire alarm key blank must be used for a run that will be installed in a
Plenum space? - answer>>>FPLP
It technician notices that a step is missing from the letter which two are the current
courses of action? - answer>>>Notify a supervisor; Tag the ladder to prevent others from
using it.
The minimum size for EMT is - answer>>>1/2 inch
The maximum size fro EMT is - answer>>>4 inches
EMT shall be securely fastened in place at least every - answer>>>10 feet
A load where the maximum current is expected to continue for 3 hours or more. -
answer>>>Continuous Load