Created By: A Solution ss ss ss
SolutionsManualforElectricalWiringCommercial18th s
ss EditionbyPhilSimmonsA+ s s s
Solution and Answer Guide s s ss ss
SIMMONS/ODE, ELECTRICAL WIRING COMMERCIAL, 18E © 2024, 9780357767115; S S S S S S S S S S S S SS
CHAPTER 1:COMMERCIAL BUILDING PLANS AND SPECIFICATIONS
SS S S S S SS SS SS
TABLE OF CONTENTS S S S S
Review .......................................................................................................................................................... 1
Note to instructor: It is recommended that students
ss ss be required to respond, where ss ss ss ss ss s s ss ss ss ss
appropriate,
s s with answers that are complete sentences. s s s s s s s s s s ss
REVIEW
Refertothe NationalElectricalCodeorthe workingdrawings whennecessary.Where
s s s s s s s s s s s s
ss applicable, responses should be written in complete sentences.
ss ss ss ss ss ss ss
1. Whatsectionofacommercialbuilding’sspecificationcontainsalistofcontract
s s s s s s s s s s s
ss documents?
Answer: A list of the contract documents is contained in General Clauses and Conditions. A
ss ss ss ss ss ss ss ss ss ss ss ss ss ss
ss listing of the Commercial Building contract documents is presented in this chapter under the
ss ss ss ss ss ss ss ss ss ss ss ss ss
ss heading“Commercial BuildingPlans.”Theinstructormaywish tohavethe students check over this
s s s s s s s s s s s s s ss
ss listing and compare it with the plans provided.
ss ss ss ss ss ss ss
2. Therequirement fortemporarylight and power at thejob sitewillbefound in what
s s s s s s ss s s s s s s ss
ss portion of a commercial building’s specification?
ss ss ss ss ss
Answer: The Supplementary General Conditions specifies the job site requirements for
ss ss ss ss ss ss ss ss ss ss
ss temporarylight and power. In some contracts, this electrical system becomes the responsibilityof the
s ss ss ss ss ss ss ss ss ss ss ss s ss
ss general contractor; in other contracts, it is the electrical contractor’s responsibility to install and
ss ss ss ss ss ss ss ss ss ss ss ss ss
maintain the temporaryelectrical system. Theinstructor maywish to refer the student to NEC Article
ss ss ss s ss ss s ss ss ss ss ss ss ss ss
ss 590 and discuss the requirements in detail.
ss ss ss ss ss ss
A+ Page 1 ss
,Created By: A Solution
ss ss ss
3. Theelectrician uses the Schedule of Working Drawings for what purpose?
s ss ss ss ss ss ss ss ss ss
Answer: The electrician uses the Schedule of Working Drawings to determine whether all of the
ss ss ss ss ss ss ss ss ss ss ss ss ss ss
ss drawings are at hand. The information on “the other sheets” may be very important, especially in
ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss
ss coordinating with other contractors.
ss ss ss
4. Complete the following items by indicating the letter(s) designating the correct source(s)
ss ss ss ss ss ss ss ss ss ss ss
ss of information:
ss
No. Answer Item Information
4. Sections Ceiling height ss Sections, Sheet A6 ss ss
5. Electrical Electricalreceptacle s Electricalsymbolschedule,Chapter
ss symbol style
ss ss 2,Figure 2–6 ss
ss schedul
e
6. Electrical Electricaloutlet Electrical layout drawings, Sheets s ss ss
ss layout location
ss ss El,E2, and E3 ss ss
ss drawing
ss s
7. Elevations Exterior wallfinishes s s Elevations, Sheets A4 and A5 ss ss ss ss
8. Site plan ss Grading elevations ss Site plan, Sheet A4
ss ss ss
9. Electrical Panelboard schedules ss Electrical layout drawings,Sheet E4 ss ss s ss
ss layout
ss drawing
ss s
10. Architectural Room width ss Architectural floor plan, Sheets Al, ss ss ss ss
ss floor plan ss A2,and A3
ss ss
11. Architectural Swing of door ss ss Architectural floor plan, Sheets Al, ss ss ss ss
ss floor plan ss A2,and A3 ss
A+ Page 2 ss
,Created By: A Solution
ss ss ss
12. Sections View of interior wall
f ss f s s f ss Sections, Sheet A6
sf f
A+ Page 3
ss
, Created By: A Solution
ss ss ss
Match the items on the left with those on the right by writing the letter designation
ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss
ss ofthe appropriate organization from the list on the right.
ss ss ss ss ss ss ss ss
13. NEC ElectricalCode s National Electrical Code (NEC) ss ss ss
14. IAEI Electrical inspectors ss
InternationalAssociationof
ElectricalInspectors (IAEI) ss
15. NFPA Fire codes ss NationalFireProtectionAssociation s s
(NFPA)
16. IESNA Lighting information s s Illuminating Engineering ss
Society ofNorth America s ss
ss (IESNA)
17. UL Listingservice Underwriters Laboratories, Inc. ss ss
(UL)
18. NEMA Manufacturers’ National Electrical ss
standards
ss ss ManufacturersAssociation
(NEMA)
ss
19. PE Seal ProfessionalEngineer (PE) s ss
Match the items on the left with those on the right by writing the letter
ss ss ss ss ss ss ss ss ss ss ss ss ss ss
ss designation ofthe proper level of NEC interpretation from the list on the
ss ss ss ss ss ss ss ss ss ss ss
ss right.
20. with Allowed by the Code ss ss ss Shall be permitted, or Shall not
ss ss ss ss ss
ss special berequired, NEC ss
ss permissi
on ss
21. with May be done ss ss Shall be permitted, or Shall not
ss s s ss s s s s
A+ Page 4 ss
SolutionsManualforElectricalWiringCommercial18th s
ss EditionbyPhilSimmonsA+ s s s
Solution and Answer Guide s s ss ss
SIMMONS/ODE, ELECTRICAL WIRING COMMERCIAL, 18E © 2024, 9780357767115; S S S S S S S S S S S S SS
CHAPTER 1:COMMERCIAL BUILDING PLANS AND SPECIFICATIONS
SS S S S S SS SS SS
TABLE OF CONTENTS S S S S
Review .......................................................................................................................................................... 1
Note to instructor: It is recommended that students
ss ss be required to respond, where ss ss ss ss ss s s ss ss ss ss
appropriate,
s s with answers that are complete sentences. s s s s s s s s s s ss
REVIEW
Refertothe NationalElectricalCodeorthe workingdrawings whennecessary.Where
s s s s s s s s s s s s
ss applicable, responses should be written in complete sentences.
ss ss ss ss ss ss ss
1. Whatsectionofacommercialbuilding’sspecificationcontainsalistofcontract
s s s s s s s s s s s
ss documents?
Answer: A list of the contract documents is contained in General Clauses and Conditions. A
ss ss ss ss ss ss ss ss ss ss ss ss ss ss
ss listing of the Commercial Building contract documents is presented in this chapter under the
ss ss ss ss ss ss ss ss ss ss ss ss ss
ss heading“Commercial BuildingPlans.”Theinstructormaywish tohavethe students check over this
s s s s s s s s s s s s s ss
ss listing and compare it with the plans provided.
ss ss ss ss ss ss ss
2. Therequirement fortemporarylight and power at thejob sitewillbefound in what
s s s s s s ss s s s s s s ss
ss portion of a commercial building’s specification?
ss ss ss ss ss
Answer: The Supplementary General Conditions specifies the job site requirements for
ss ss ss ss ss ss ss ss ss ss
ss temporarylight and power. In some contracts, this electrical system becomes the responsibilityof the
s ss ss ss ss ss ss ss ss ss ss ss s ss
ss general contractor; in other contracts, it is the electrical contractor’s responsibility to install and
ss ss ss ss ss ss ss ss ss ss ss ss ss
maintain the temporaryelectrical system. Theinstructor maywish to refer the student to NEC Article
ss ss ss s ss ss s ss ss ss ss ss ss ss ss
ss 590 and discuss the requirements in detail.
ss ss ss ss ss ss
A+ Page 1 ss
,Created By: A Solution
ss ss ss
3. Theelectrician uses the Schedule of Working Drawings for what purpose?
s ss ss ss ss ss ss ss ss ss
Answer: The electrician uses the Schedule of Working Drawings to determine whether all of the
ss ss ss ss ss ss ss ss ss ss ss ss ss ss
ss drawings are at hand. The information on “the other sheets” may be very important, especially in
ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss
ss coordinating with other contractors.
ss ss ss
4. Complete the following items by indicating the letter(s) designating the correct source(s)
ss ss ss ss ss ss ss ss ss ss ss
ss of information:
ss
No. Answer Item Information
4. Sections Ceiling height ss Sections, Sheet A6 ss ss
5. Electrical Electricalreceptacle s Electricalsymbolschedule,Chapter
ss symbol style
ss ss 2,Figure 2–6 ss
ss schedul
e
6. Electrical Electricaloutlet Electrical layout drawings, Sheets s ss ss
ss layout location
ss ss El,E2, and E3 ss ss
ss drawing
ss s
7. Elevations Exterior wallfinishes s s Elevations, Sheets A4 and A5 ss ss ss ss
8. Site plan ss Grading elevations ss Site plan, Sheet A4
ss ss ss
9. Electrical Panelboard schedules ss Electrical layout drawings,Sheet E4 ss ss s ss
ss layout
ss drawing
ss s
10. Architectural Room width ss Architectural floor plan, Sheets Al, ss ss ss ss
ss floor plan ss A2,and A3
ss ss
11. Architectural Swing of door ss ss Architectural floor plan, Sheets Al, ss ss ss ss
ss floor plan ss A2,and A3 ss
A+ Page 2 ss
,Created By: A Solution
ss ss ss
12. Sections View of interior wall
f ss f s s f ss Sections, Sheet A6
sf f
A+ Page 3
ss
, Created By: A Solution
ss ss ss
Match the items on the left with those on the right by writing the letter designation
ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss
ss ofthe appropriate organization from the list on the right.
ss ss ss ss ss ss ss ss
13. NEC ElectricalCode s National Electrical Code (NEC) ss ss ss
14. IAEI Electrical inspectors ss
InternationalAssociationof
ElectricalInspectors (IAEI) ss
15. NFPA Fire codes ss NationalFireProtectionAssociation s s
(NFPA)
16. IESNA Lighting information s s Illuminating Engineering ss
Society ofNorth America s ss
ss (IESNA)
17. UL Listingservice Underwriters Laboratories, Inc. ss ss
(UL)
18. NEMA Manufacturers’ National Electrical ss
standards
ss ss ManufacturersAssociation
(NEMA)
ss
19. PE Seal ProfessionalEngineer (PE) s ss
Match the items on the left with those on the right by writing the letter
ss ss ss ss ss ss ss ss ss ss ss ss ss ss
ss designation ofthe proper level of NEC interpretation from the list on the
ss ss ss ss ss ss ss ss ss ss ss
ss right.
20. with Allowed by the Code ss ss ss Shall be permitted, or Shall not
ss ss ss ss ss
ss special berequired, NEC ss
ss permissi
on ss
21. with May be done ss ss Shall be permitted, or Shall not
ss s s ss s s s s
A+ Page 4 ss