A |quick |and |accurate |means |to |estimate |dimensions |of |a |commercial |space |during |a |site |
inspection |would |be |to |_____?
- |Count |the |number |of |ceiling |tiles |in |a |drop |tile |installation
- |Pace |off |number |of |steps |across |the |room |using |an |average |of |3' |(1m) |per |step
- |Utilize |your |arm |span |to |measure |the |walls |using |an |average |of |5' |6" |(1.5m)
- |Estimate |based |upon |the |number |of |fire |sprinklers |- |CORRECT |ANSWER✔✔-Count |the |
number |of |ceiling |tiles |in |a |drop |tile |installation
A |client |requires |a |new |boardroom. |The |sales |person |and |engineer |are |sent |to |the |premises |to
|survey |the |facility |and |discuss |the |opportunity |with |the |client. |This |process |is |best |described |
as |a |____
- |Cost |Analysis
- |Functional |Analysis
- |Needs |Analysis
- |Control |Analysis |- |CORRECT |ANSWER✔✔-Needs |Analysis
,When |designing |a |client's |new |training |room, |the |MOST |important |information |would |come |
from |the
- |client's |checklist |of |preferred |equipment
- |end-user |descriptions |of |how |the |room |will |be |utilized
- |architectural |drawings |of |the |building
- |feedback |from |the |benchmarking |site |visit |- |CORRECT |ANSWER✔✔-end-user |descriptions |of |
how |the |room |will |be |utilized
When |establishing |initial |contact |with |a |client, |try |to |develop |a |relationship |early |on |with |the:
- |Chief |operating |officer
- |Information |technology |manager
- |Stakeholders
- |Purchasing |manager |- |CORRECT |ANSWER✔✔-Stakeholders
When |creating |an |AV |solution |for |a |client, |the |first |step |should |be
- |creating |a |quote
- |Proposing |a |technology
,- |reviewing |existing |infrastructure
- |Gathering |application |requirements |- |CORRECT |ANSWER✔✔-Gathering |application |
requirements
AV |professionals |determine |the |end |user's |needs |by |examining |three |things: |the |required |
applications, |the |tasks, |and |the:
- |Overall |design |concept
- |Budget
- |Technologies
- |Functions |to |support |the |applications |- |CORRECT |ANSWER✔✔-Functions |to |support |the |
applications
What |is |the |BEST |way |to |determine |how |reverberant |a |space |is?
- |Clap |your |hands |and |listen |for |an |echo
- |Ask |the |client |if |anyone |has |complained |that |the |room |is |too |noisy
- |Use |an |RT60 |meter
- |Use |a |DB |SPL |meter |- |CORRECT |ANSWER✔✔-Use |an |RT60 |meter
__ |is |the |process |of |examining |methods, |techniques, |and |principles |from |peer |organizations |
and |facilities.
- |Schematic |Design
- |Punching |a |system
, - |Benchmarking
| -Schematic |Design |- |CORRECT |ANSWER✔✔-Benchmarking
When |working |with |a |client |what |should |be |AVOIDED |to |ensure |that |you |are |communicating |
effectively?
- |Using |diagrams |and |drawings |as |a |reference
- |Industry |slang |terms |and |jargon
- |Plain |language
- |Demonstrating |abstract |concepts |with |real |life |examples |- |CORRECT |ANSWER✔✔-Industry |
slang |terms |and |jargon
Prior |to |conducting |a |needs |analysis |for |a |new |project, |a |coworker |tells |the |AV |designer |what |
equipment |package |they |know |will |work. |What |should |the |designer |do |with |this |information?
- |Contact |the |client |about |the |equipment |package.
- |Price |out |the |equipment |package |to |present |to |the |client.
- |Setup |a |demonstration |to |show |the |functionality |of |the |equipment |package.
- |Thank |the |coworker |for |their |input, |remind |them |that |you |still |need |to |conduct |a |needs |
analysis. |- |CORRECT |ANSWER✔✔-Thank |the |coworker |for |their |input, |remind |them |that |you |
still |need |to |conduct |a |needs |analysis.
The |correct |time |to |discuss |visible |finishes |for |wall |plates, |surface |mount |speakers, |and |wall |
mounted |screen |casings |is |during |the:
- |Ordering
- |Installation
- |Site |survey
CORRECT ANSWERS
A |quick |and |accurate |means |to |estimate |dimensions |of |a |commercial |space |during |a |site |
inspection |would |be |to |_____?
- |Count |the |number |of |ceiling |tiles |in |a |drop |tile |installation
- |Pace |off |number |of |steps |across |the |room |using |an |average |of |3' |(1m) |per |step
- |Utilize |your |arm |span |to |measure |the |walls |using |an |average |of |5' |6" |(1.5m)
- |Estimate |based |upon |the |number |of |fire |sprinklers |- |CORRECT |ANSWER✔✔-Count |the |
number |of |ceiling |tiles |in |a |drop |tile |installation
A |client |requires |a |new |boardroom. |The |sales |person |and |engineer |are |sent |to |the |premises |to
|survey |the |facility |and |discuss |the |opportunity |with |the |client. |This |process |is |best |described |
as |a |____
- |Cost |Analysis
- |Functional |Analysis
- |Needs |Analysis
- |Control |Analysis |- |CORRECT |ANSWER✔✔-Needs |Analysis
,When |designing |a |client's |new |training |room, |the |MOST |important |information |would |come |
from |the
- |client's |checklist |of |preferred |equipment
- |end-user |descriptions |of |how |the |room |will |be |utilized
- |architectural |drawings |of |the |building
- |feedback |from |the |benchmarking |site |visit |- |CORRECT |ANSWER✔✔-end-user |descriptions |of |
how |the |room |will |be |utilized
When |establishing |initial |contact |with |a |client, |try |to |develop |a |relationship |early |on |with |the:
- |Chief |operating |officer
- |Information |technology |manager
- |Stakeholders
- |Purchasing |manager |- |CORRECT |ANSWER✔✔-Stakeholders
When |creating |an |AV |solution |for |a |client, |the |first |step |should |be
- |creating |a |quote
- |Proposing |a |technology
,- |reviewing |existing |infrastructure
- |Gathering |application |requirements |- |CORRECT |ANSWER✔✔-Gathering |application |
requirements
AV |professionals |determine |the |end |user's |needs |by |examining |three |things: |the |required |
applications, |the |tasks, |and |the:
- |Overall |design |concept
- |Budget
- |Technologies
- |Functions |to |support |the |applications |- |CORRECT |ANSWER✔✔-Functions |to |support |the |
applications
What |is |the |BEST |way |to |determine |how |reverberant |a |space |is?
- |Clap |your |hands |and |listen |for |an |echo
- |Ask |the |client |if |anyone |has |complained |that |the |room |is |too |noisy
- |Use |an |RT60 |meter
- |Use |a |DB |SPL |meter |- |CORRECT |ANSWER✔✔-Use |an |RT60 |meter
__ |is |the |process |of |examining |methods, |techniques, |and |principles |from |peer |organizations |
and |facilities.
- |Schematic |Design
- |Punching |a |system
, - |Benchmarking
| -Schematic |Design |- |CORRECT |ANSWER✔✔-Benchmarking
When |working |with |a |client |what |should |be |AVOIDED |to |ensure |that |you |are |communicating |
effectively?
- |Using |diagrams |and |drawings |as |a |reference
- |Industry |slang |terms |and |jargon
- |Plain |language
- |Demonstrating |abstract |concepts |with |real |life |examples |- |CORRECT |ANSWER✔✔-Industry |
slang |terms |and |jargon
Prior |to |conducting |a |needs |analysis |for |a |new |project, |a |coworker |tells |the |AV |designer |what |
equipment |package |they |know |will |work. |What |should |the |designer |do |with |this |information?
- |Contact |the |client |about |the |equipment |package.
- |Price |out |the |equipment |package |to |present |to |the |client.
- |Setup |a |demonstration |to |show |the |functionality |of |the |equipment |package.
- |Thank |the |coworker |for |their |input, |remind |them |that |you |still |need |to |conduct |a |needs |
analysis. |- |CORRECT |ANSWER✔✔-Thank |the |coworker |for |their |input, |remind |them |that |you |
still |need |to |conduct |a |needs |analysis.
The |correct |time |to |discuss |visible |finishes |for |wall |plates, |surface |mount |speakers, |and |wall |
mounted |screen |casings |is |during |the:
- |Ordering
- |Installation
- |Site |survey