100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CMRP PRACTICE QUESTIONS & ANSWERS(RATED A+)

Rating
-
Sold
-
Pages
12
Grade
A+
Uploaded on
24-08-2025
Written in
2025/2026

Replacement Asset Value (RAV) - ANSWERdefined as the cost that would be incurred, in today's dollars, to replace the facility and equipment in its current configuration. Overall Equipment Effectiveness (OEE) definition - ANSWERmetric for measuring how well a process is operating by evaluating the three major process components: availability, performance efficiency (rate/speed) and quality. The process can be a single piece of equipment, a manufacturing cell, a production line or a plant Overall Equipment Effectiveness (OEE) equation - ANSWERAvailability × Performance Efficiency × Quality

Show more Read less
Institution
CMRP
Course
CMRP









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CMRP
Course
CMRP

Document information

Uploaded on
August 24, 2025
Number of pages
12
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • cmrp

Content preview

CMRP PRACTICE QUESTIONS &
ANSWERS(RATED A+)
Replacement Asset Value (RAV) - ANSWERdefined as the cost that would be incurred,
in today's dollars, to replace the facility and equipment in its current configuration.

Overall Equipment Effectiveness (OEE) definition - ANSWERmetric for measuring how
well a process is operating by evaluating the three major process components:
availability, performance efficiency (rate/speed) and quality. The process can be a
single piece of equipment, a manufacturing cell, a production line or a plant

Overall Equipment Effectiveness (OEE) equation - ANSWERAvailability × Performance
Efficiency × Quality

Availability - ANSWERdefined as the percentage of time that the process is actually
operating (uptime) compared to when it is scheduled to operate

Performance efficiency (rate/speed) - ANSWERdefined as the percentage of Actual Run
Rate/Cycle Time to the Best Run Rate/Cycle Time

Quality - ANSWERdefined as the percentage of "First Pass, First Time" Saleable
Production to the Actual Production

Actual Production - ANSWERtotal quantity of production produced in the given time
period, regardless of its quality

Lagging Indicator - ANSWERAn indicator that measures performance after the business
or process result starts to follow a particular pattern or trend

Leading Indicator - ANSWERAn indicator that measures performance before the
business or process result starts to follow a particular pattern or trend

Three (3) sets of measurable components that make up the maintenance and reliability
process - ANSWER1. Management processes and behaviors (mission and vision,
people skills)
2. Operational execution (operations, design and maintenance)
3. Manufacturing performance (availability, quality, cost and benefits)

mean metrics - ANSWERmetrics that describe the Reliability, Availability and
Maintainability (RAM) characteristics of a component, asset or even facility

Inherent Availability - ANSWERmeasure of the variables inherent in the design that
affect availability. In the calculation of downtime, it usually includes only active repair

, time. It does not include preventive maintenance time and administrative or logistic
delays, but does include corrective maintenance downtime

Inherent Availability Formula - ANSWERAi = MTBF / (MTBF + MTTR)
Where MTBF = Mean Time Between Failures
And MTTR = Mean Time to Repair (corrective maintenance only)

Achieved Availability - ANSWERprobability that an item, when used under design
conditions in an ideal support environment, will perform satisfactorily. It includes both
active repair time and preventive maintenance time, but excludes administrative and
logistic delay times

Achieved Availability Formula - ANSWERAa = MTBM / (MTBM + MDTM)
Where MTBM = Mean Time Between Maintenance
And MDTM = Mean Downtime for Maintenance

Operational Availability - ANSWERprobability that an item, when used under design
conditions in an operational environment, will perform satisfactorily. It includes active
repair time, preventive maintenance time and administrative and logistic delays and
represents the availability that is actually experienced

Operational Availability Formula - ANSWERAo = MTBM / (MTBM + MDT)
Where MTBM = Mean Time Between Maintenance
And MDT = Mean Down Time

Equipment Availability - ANSWERdefined by The Association for Manufacturing
Technology as the percentage of potential production time during which equipment is
operable. The term is applied to a single piece of manufacturing equipment (or several
machines acting as a unit)

Equipment Availability Formula - ANSWER= [Production Time / Potential Production
Time] x 100

Point Availability - ANSWERprobability that a device, system or component will be
operational at any random point in time


Total Maintenance Cost - ANSWERTotal expenditures for maintenance labor (including
maintenance performed by operators, e.g., total productive maintenance (TPM),
materials, contractors, services and resources. Include all maintenance expenses for
outages, shutdowns or turnarounds, as well as normal operating times. Include capital
expenditures directly related to end-of-life machinery replacement

Stocked MRO Inventory Value As a
Percent of Replacement Value (RAV) - ANSWERThe metric is the value of
maintenance, repair and operating materials (MRO) and spare parts stocked on site to

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
shantelleG West Virgina University
View profile
Follow You need to be logged in order to follow users or courses
Sold
603
Member since
2 year
Number of followers
368
Documents
17818
Last sold
17 hours ago
GOLD PREMIUM

HELLO? welcome to my store thanks for visiting this page here you are guaranteed of well revised and assured EXAMS ALL GRADED A+ thus making your education journey easy and seamless . DO NOT HESITATE TO CONTACT ME IF YOU ARE IN NEED OF ANY EXAM .I AM READY 24/7 TO ASSIST YOU ALSO REFER YOUR FRIENDS.

4.1

114 reviews

5
69
4
10
3
21
2
2
1
12

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions