100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

Boiler Set Number 2 - Special Engineer Questions and Verified Correct Answers

Rating
-
Sold
-
Pages
8
Grade
A+
Uploaded on
22-08-2025
Written in
2025/2026

Boiler Set Number 2 - Special Engineer Questions and Verified Correct Answers Means a three part technical document that is written and published by the national board detailing the installation, inspection, and repair of boilers and Pressure vessels. - correct answer National Board Inspection Code (NBIC) Who is at least 16 years old but less than 18 years old, not more than 50 horsepower, not more than 100 horsepower, appetence. - correct answer Special Engineer (B) Shall be at least 18 years of age, not more than 50 horsepower or to operate shift engineer in a plant of not more than 100 horse power, an apprentice. - correct answer Special Engineer (A) . Shall be at least 18 years of age, not more than 100 horsepower, Low- Pressure plant of not more than 500 horsepower, 1 year of actual experience. - correct answer Second Class Engineer Grade C Shall be 18 year old, not more than 100 horsepower, or operates as sift engineer in a plant of not more than 500 horsepower, At least 1 year of experience. - correct answer Second Class Engineer Grade B. Shall be 18 years of age, not more than 100 horsepower or to operate as a shift engineer in a plant of not more than 500 horsepower. At least 1 year of actual Experience. - correct answer Second Class Engineer Grade A

Show more Read less
Institution
MN Boiler License
Course
MN Boiler License









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
MN Boiler License
Course
MN Boiler License

Document information

Uploaded on
August 22, 2025
Number of pages
8
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Boiler Set Number 2 - Special Engineer
Questions and Verified Correct Answers

Means a three part technical document that is written

and published by the national board detailing the installation, inspection, and repair of boilers
and Pressure vessels. - correct answer ✔✔National Board Inspection Code (NBIC)



Who is at least 16 years old but less than 18 years old, not more than 50 horsepower, not more
than 100 horsepower, appetence. - correct answer ✔✔Special Engineer (B)



Shall be at least 18 years of age, not more than 50 horsepower or to operate shift engineer in a
plant of not more than 100 horse power, an apprentice. - correct answer ✔✔Special Engineer
(A) .



Shall be at least 18 years of age, not more than 100 horsepower, Low- Pressure plant of not
more than 500 horsepower, 1 year of actual experience. - correct answer ✔✔Second Class
Engineer Grade C



Shall be 18 year old, not more than 100 horsepower, or operates as sift engineer in a plant of
not more than 500 horsepower, At least 1 year of experience. - correct answer ✔✔Second Class
Engineer Grade B.



Shall be 18 years of age, not more than 100 horsepower or to operate as a shift engineer in a
plant of not more than 500 horsepower. At least 1 year of actual Experience. - correct answer
✔✔Second Class Engineer Grade A



Shall be 18 years old, their appurtenances of not more than 500 horsepower, at least 3 years of
actual experience. - correct answer ✔✔First Class Engineer Grade C

, Shall be 18 years old, no more than 500 horsepower, at least 3 years of experience. - correct
answer ✔✔First Class Engineer Grade B



Shall be 18 years old, not more than 500 horsepower, 2 years of experience. - correct answer
✔✔First Class Engineer Grade A



An individual seeking license, shall be 18 years old, shall have 5 years of experience. - correct
answer ✔✔Chief Engineer Grade C



Individual seeking licensure, shall be at least 18 years old of age, and at least 5 years of actual
experience. - correct answer ✔✔Chief Engineer Grade B.



An Individual seeking licensure, shall be 18 years of age, and shall have 2 years experience in
operation. - correct answer ✔✔Chief Engineer Grade A



10 degree 1% - correct answer ✔✔Using an Economizer for every ___ degree increase in FW
temp, there is a ___% increase in efficiency.



Pounds Per Square Inch Gauge. - correct answer ✔✔PSIG



Means the act of viewing or overseeing the boiler or boiler plant operating parameters and
conditions from a remote location. - correct answer ✔✔Remote Monitoring



Means the work necessary to restore a boiler or pressure vessel to a safe and satisfactory
operation condition, as defined in National Board inspection code,

(part 3, section 9.) - correct answer ✔✔Repair
$12.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
STUVIA2024
5.0
(1)

Also available in package deal

Thumbnail
Package deal
package deal for MN BOILER LICENSE EXAM (LATEST UPDATE)
-
9 2025
$ 149.41 More info

Get to know the seller

Seller avatar
STUVIA2024 Chamberlain College Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
5
Member since
8 months
Number of followers
0
Documents
5546
Last sold
1 week ago

5.0

1 reviews

5
1
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions