FDOT Asphalt Paving Level 2 Questions
With Correct Answers
What makes up a quality asphalt mixture? - CORRECT ANSWER✔✔-A quality
| | | | | | | | | | |
asphalt mixture is determined by the constructability, if it conforms to
| | | | | | | | | | |
Specifications, and if it satisfies functional requirements.
| | | | | |
CQC - CORRECT ANSWER✔✔-contractor quality control
| | | | |
Superpave - CORRECT ANSWER✔✔-Asphalt mix design system since 1998
| | | | | | | |
QCP - CORRECT ANSWER✔✔-Quality control plan
| | | | |
QCM - CORRECT ANSWER✔✔-Quality control Manual
| | | | |
QC - CORRECT ANSWER✔✔-Quality Control (Contracting Testing and Inspection)
| | | | | | | |
VT - CORRECT ANSWER✔✔-Verification Testing (FDOT or CEI Verification)
| | | | | | | |
CEI - CORRECT ANSWER✔✔-Construction Engineering and Inspection
| | | | | |
RT - CORRECT ANSWER✔✔-Resolution Testing (FDOT)
| | | | |
IV - CORRECT ANSWER✔✔-Independent Verification Testing
| | | | |
, IA - CORRECT ANSWER✔✔-Independent Assurance Testing
| | | | |
The decision-making authority on a job needs to be given to who? - CORRECT
| | | | | | | | | | | | | |
ANSWER✔✔-Needs to be given to the level closet to the work as specified in the
| | | | | | | | | | | | | | |
specifications. It ensure a quick handle on situations and issues.
| | | | | | | | |
The governing order of project documents from high (1) to low (7) starts with the
| | | | | | | | | | | | | | |
highest being - CORRECT ANSWER✔✔-Special Provisions
| | | | |
The governing order of project documents from high to low (2) - CORRECT
| | | | | | | | | | | | |
ANSWER✔✔-Technical Special Provisions | |
The governing order of project documents from high to low (3) - CORRECT
| | | | | | | | | | | | |
ANSWER✔✔-Plans
The governing order of project documents from high to low (4) - CORRECT
| | | | | | | | | | | | |
ANSWER✔✔-Road design, structures, and traffic operations standards
| | | | | |
The governing order of project documents from high to low (5) - CORRECT
| | | | | | | | | | | | |
ANSWER✔✔-Developmental Specifications |
The governing order of project documents from high to low (6) - CORRECT
| | | | | | | | | | | | |
ANSWER✔✔-Supplemental Specifications |
With Correct Answers
What makes up a quality asphalt mixture? - CORRECT ANSWER✔✔-A quality
| | | | | | | | | | |
asphalt mixture is determined by the constructability, if it conforms to
| | | | | | | | | | |
Specifications, and if it satisfies functional requirements.
| | | | | |
CQC - CORRECT ANSWER✔✔-contractor quality control
| | | | |
Superpave - CORRECT ANSWER✔✔-Asphalt mix design system since 1998
| | | | | | | |
QCP - CORRECT ANSWER✔✔-Quality control plan
| | | | |
QCM - CORRECT ANSWER✔✔-Quality control Manual
| | | | |
QC - CORRECT ANSWER✔✔-Quality Control (Contracting Testing and Inspection)
| | | | | | | |
VT - CORRECT ANSWER✔✔-Verification Testing (FDOT or CEI Verification)
| | | | | | | |
CEI - CORRECT ANSWER✔✔-Construction Engineering and Inspection
| | | | | |
RT - CORRECT ANSWER✔✔-Resolution Testing (FDOT)
| | | | |
IV - CORRECT ANSWER✔✔-Independent Verification Testing
| | | | |
, IA - CORRECT ANSWER✔✔-Independent Assurance Testing
| | | | |
The decision-making authority on a job needs to be given to who? - CORRECT
| | | | | | | | | | | | | |
ANSWER✔✔-Needs to be given to the level closet to the work as specified in the
| | | | | | | | | | | | | | |
specifications. It ensure a quick handle on situations and issues.
| | | | | | | | |
The governing order of project documents from high (1) to low (7) starts with the
| | | | | | | | | | | | | | |
highest being - CORRECT ANSWER✔✔-Special Provisions
| | | | |
The governing order of project documents from high to low (2) - CORRECT
| | | | | | | | | | | | |
ANSWER✔✔-Technical Special Provisions | |
The governing order of project documents from high to low (3) - CORRECT
| | | | | | | | | | | | |
ANSWER✔✔-Plans
The governing order of project documents from high to low (4) - CORRECT
| | | | | | | | | | | | |
ANSWER✔✔-Road design, structures, and traffic operations standards
| | | | | |
The governing order of project documents from high to low (5) - CORRECT
| | | | | | | | | | | | |
ANSWER✔✔-Developmental Specifications |
The governing order of project documents from high to low (6) - CORRECT
| | | | | | | | | | | | |
ANSWER✔✔-Supplemental Specifications |