2025/2026 QUESTIONS AND ANSWERS GRADED A++
✔✔What are the components of the Fire Triangle ? - ✔✔Fuel Ignition source oxygen
✔✔If equipped with an over fill alarm, it must be located? - ✔✔So it can be seen or
heard from the delivery location.
✔✔UDC was required at time of installation for all systems installed after? -
✔✔Januarary 1 2000
✔✔If installed, the following requires independent 3rd party certification to prove
compliance with established regulations. - ✔✔Automatic Tank Gauge
Liquid Product Detectors
SIR
✔✔Where are ATG's installed ? - ✔✔Opening in top of the tank
✔✔What is true about ATG's - ✔✔They're capable of alarming operator of low product
level
✔✔The following types of releases must be reported to the local Agency. - ✔✔Releases
greater than 25 gallons that escape secondary containment.
Release that escape primary containment.
Releases less then 25 gallons which escape secondary containment
✔✔If an unauthorized product release meets the requirements for reporting to the local
agency, verbal notification must be made within ____hours, followed by a written
notification within ____days. - ✔✔24, 5
✔✔The following unusual conditions shall be reported to the local agency, EXCEPT: -
✔✔Water in spill buckets
✔✔If the monitoring system detects a leak that has occurred, the local agency must be
notified. - ✔✔Unless the monitoring device is found to be defective and is immediately
repaired.
✔✔The written report submitted to the local agency after an unauthorized release is
required to include the following EXCEPT: - ✔✔Cause of release
✔✔An unauthorized release which does not escape secondary containment, requires
only recordation on the Operators Manual Report provided. - ✔✔It did not cause
deterioration of secondary containment.
, It did not increase the hazard of fire.
It was cleaned up within eight hours addicti it was cleaned up within eight hours
detection.
✔✔Recording of an authorized release in the operators monitoring records shall
include? - ✔✔Actions taken to prevent further releases.
✔✔If An authorize release meets reporting requirements of title 23 section 2652 the
report must be filed within the? - ✔✔Local agency
✔✔Which statement concerning the annual monitor certification is most correct? -
✔✔Local agencies must be notified 48 hours prior to certification in results must be
submitted within 30 days of certification.
✔✔The annual monitor certification may be performed by ? - ✔✔A person possessing
the appropriate contractors license.
An individual trained and certified by the manufacture of the monitoring equipment.
✔✔The following is true of secondary containment EXCEPT: - ✔✔Must be tested every
24 months.
✔✔Enhanced the detections results must be submitted to ___ within ___days - ✔✔The
local agency and State water resources control Board.
60
✔✔The EPA recommends that monthly the operator should conduct a walk-through
inspection of the following EXCEPT : - ✔✔Facility lighting
✔✔Cathodic protection systems must be tested within ____Months of installation and
every ____months thereafter. - ✔✔6, 36
✔✔Impressed current catholic protection systems shall be expected no less then every
? - ✔✔30 days
✔✔The EPA suggested list of supplies for spill containment and clean up include all the
following EXCEPT: - ✔✔Wet dry shop vacuum
✔✔According to the health and safety code the owner of a new tank must conduct a
one time ELD test if the tank is located within 1000 ft of a public drinking water well.
This test must accomplished by ? - ✔✔January 1, 2005
✔✔The following is true of SIR data. - ✔✔Must be submitted monthly to reconciliation
provider.