Quiz: On Multi FIN Project Numbers Under One Contract, The Asphalt Is Reported On The Certification,
By The CONTRACTOR, Under What Project FIN Number?
Answer; The Contractor Shows The Asphalt On The Lead FIN Project Number
Quiz: A Roadway Is Being Constructed And Has A Subsoil Excavation Quantity Of 835 CY, A Regular
Excavation Quantity Of 250 CY And An Embankment Quantity Of 1040 CY. Based Upon This Information,
The Final Quantity To Be Paid For Embankment Will Be?
Answer; 1875 CY
Quiz: Which Document Is Used To Authorize Payment From Original Contingency Amount?
O © 2025 Testtrackers
O Whatsapp Or Call [+254707240657]
O Resources & Updates: [Testtrackers - Stuvia US]
O Your Success Is Our Mission!
O For Online Exams And Tutor Expert, Please Whatsapp Me In The Number Given.
,2
Answer; Work Order
Quiz: Friction Course (FC-12.5) Straight Edge Deficiency: A Straightedge Deficiency Was Left In Place At
No Pay. Calculate The Equivalent Tonnage At No Pay. ( Pay To Appropriate Accuracy) Gmm= 2.417,
Thickness =1.5 Inches, Road Width =12 Feet, Length Of Deficiency = 5 Ft. (This Occurred 25 Feet From
The Bridge Deck)
Answer; 8.4 Tons
Quiz: Overruns Or Underruns Must Be Explained When?
Answer; A Pay Item Overruns Or Underruns $10,000 Or More.
Quiz: Prices Are Adjusted On Each Progress Estimate To Reflect Increases Or Decreases In The Price Of
Fuel For Contracts With Original Contract Time:
, O © 2025 Testtrackers
O Whatsapp Or Call [+254707240657]
O Resources & Updates: [Testtrackers - Stuvia US]
O Your Success Is Our Mission!
O For Online Exams And Tutor Expert, Please Whatsapp Me In The Number Given.
3
Answer; In Excess Of 120 Calendar Days.
Quiz: Which Of The Following Is An Authorized Way To Modify The Contract, Once It Has Been
Executed?
Answer; Work Orders And Supplimental Agreements
Quiz: Of The Contract Documents Listed Below Which One Would Govern?
Answer; Special Provisions
Quiz: Why Is It Important To Run A Progress Estimate Soon After Final Acceptance?
Answer; So The Estimate Can Be Paid Through EED Quickly To Prevent Interest.
CORRECT (VERIFIED ANSWERS) GRADED [A+] LATEST VERSION
1
Quiz: On Multi FIN Project Numbers Under One Contract, The Asphalt Is Reported On The Certification,
By The CONTRACTOR, Under What Project FIN Number?
Answer; The Contractor Shows The Asphalt On The Lead FIN Project Number
Quiz: A Roadway Is Being Constructed And Has A Subsoil Excavation Quantity Of 835 CY, A Regular
Excavation Quantity Of 250 CY And An Embankment Quantity Of 1040 CY. Based Upon This Information,
The Final Quantity To Be Paid For Embankment Will Be?
Answer; 1875 CY
Quiz: Which Document Is Used To Authorize Payment From Original Contingency Amount?
O © 2025 Testtrackers
O Whatsapp Or Call [+254707240657]
O Resources & Updates: [Testtrackers - Stuvia US]
O Your Success Is Our Mission!
O For Online Exams And Tutor Expert, Please Whatsapp Me In The Number Given.
,2
Answer; Work Order
Quiz: Friction Course (FC-12.5) Straight Edge Deficiency: A Straightedge Deficiency Was Left In Place At
No Pay. Calculate The Equivalent Tonnage At No Pay. ( Pay To Appropriate Accuracy) Gmm= 2.417,
Thickness =1.5 Inches, Road Width =12 Feet, Length Of Deficiency = 5 Ft. (This Occurred 25 Feet From
The Bridge Deck)
Answer; 8.4 Tons
Quiz: Overruns Or Underruns Must Be Explained When?
Answer; A Pay Item Overruns Or Underruns $10,000 Or More.
Quiz: Prices Are Adjusted On Each Progress Estimate To Reflect Increases Or Decreases In The Price Of
Fuel For Contracts With Original Contract Time:
, O © 2025 Testtrackers
O Whatsapp Or Call [+254707240657]
O Resources & Updates: [Testtrackers - Stuvia US]
O Your Success Is Our Mission!
O For Online Exams And Tutor Expert, Please Whatsapp Me In The Number Given.
3
Answer; In Excess Of 120 Calendar Days.
Quiz: Which Of The Following Is An Authorized Way To Modify The Contract, Once It Has Been
Executed?
Answer; Work Orders And Supplimental Agreements
Quiz: Of The Contract Documents Listed Below Which One Would Govern?
Answer; Special Provisions
Quiz: Why Is It Important To Run A Progress Estimate Soon After Final Acceptance?
Answer; So The Estimate Can Be Paid Through EED Quickly To Prevent Interest.