100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

APM Life Cycle Costing Awesome Guide With 100% Correct Verified Answers.

Rating
-
Sold
-
Pages
2
Grade
A+
Uploaded on
13-08-2025
Written in
2025/2026

Life Cycle Costing (LCC) - correct answers The total cost of ownership of a product, structure, or system over its useful life 4 Stages of LCC - correct answers Acquisition Operations Service Disposal Which stage accounts for 40-60% of the total cost and decisions made in this stage affect 100% of the LCC? - correct answers Acquisition Cost Estimating Relationship (CER) - correct answers A function representation of the cost components in terms of the decision variables. They are utilized to analyze the expected effect of changing any of the decision variables on one or more of the cost components. Two principles of uncertainty that LCC model builders should consider - correct answers Uncertainty regarding the activities Uncertainty regarding the expected cost of these activities Sources of cost uncertainty - correct answers Inflation rates, expected efficiency and utilization of resources, the failure rate of the system components. Tolerance of costs uncertainty is -30% to +50% Classification of Cost Components - correct answers1. Conceptual Design Phase 2. Advanced Development and Detailed Design Phase 3. Production Phase 4. Operating and Maintaining the System 5. Divest and Disposal Conceptual Design Phase - correct answers Feasibility studies, configuration analysis and selection, systems engineering, initial logistics analysis, initial design. Cost increase with the degree of innovation involved Advanced Development and Detailed Design Phase - correct answers Product and process design, preparation of final performance requirements, preparation of the WBS, schedule and budget, preparation of resource management plan. Production Phase - correct answers Construction of new facilities or remodeling of the existing facilities, cost of equipment, labor, materials and documentations. In many projects it is the highest cost phase Cost of operating and maintaining the system - correct answers Cost of operations and maintenance personnel, energy costs, spare parts, transportation costs, inventory management costs, design changes, upgrade costs Divestment and Disposal Phase - correct answers Parts and sub-assemblies must be inventoried, sold for scrap or discarded Methods of Classifying Costs - correct answers Life Cycle Manufacturing and Accounting Approach Time the cost is realized (all cost items incurred in the same period are grouped together) Pareto (ABC) Analysis - correct answers Used to identity the most important cost components Three groups: A: Small percentage of the top cost components (10-15%) which account for roughly 60% or more of the total cost B: All cost components that are not members of A or C C: Large percentage of the bottom cost components (50%) which account for 10% or less of the total cost Cost of new design size - correct answers C=Cr * (Qc

Show more Read less
Institution
Course








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Course

Document information

Uploaded on
August 13, 2025
Number of pages
2
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

APM Life Cycle Costing

Life Cycle Costing (LCC) - correct answers The total cost of ownership of a product, structure, or system
over its useful life



4 Stages of LCC - correct answers Acquisition

Operations

Service

Disposal



Which stage accounts for 40-60% of the total cost and decisions made in this stage affect 100% of the
LCC? - correct answers Acquisition



Cost Estimating Relationship (CER) - correct answers A function representation of the cost components
in terms of the decision variables. They are utilized to analyze the expected effect of changing any of the
decision variables on one or more of the cost components.



Two principles of uncertainty that LCC model builders should consider - correct answers Uncertainty
regarding the activities

Uncertainty regarding the expected cost of these activities



Sources of cost uncertainty - correct answers Inflation rates, expected efficiency and utilization of
resources, the failure rate of the system components.

Tolerance of costs uncertainty is -30% to +50%



Classification of Cost Components - correct answers1. Conceptual Design Phase

2. Advanced Development and Detailed Design Phase

3. Production Phase

4. Operating and Maintaining the System

5. Divest and Disposal
$14.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
RealGrades Nursing
Follow You need to be logged in order to follow users or courses
Sold
170
Member since
2 year
Number of followers
52
Documents
11665
Last sold
3 weeks ago

4.0

26 reviews

5
12
4
5
3
7
2
1
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions