The Clean Water Act The 1970s federal law that set into place the regulation of
stormwater.
NPDES Requirements for managing storm water activity on a
construction site.
The Notice of Termination All construction activity (inside and outside) is complete
(NOT) can be filed when and permanent stabilization has been verified as
adequate to meet permit requirements.
All of the following must 4. Submit the Notice of Termination (NOT).
occur before construction
starts, except:
1. Prepare the SWPPP
2. Determine the Operator(s)
3. Submit the Notice of Intent
(NOI)
4. Submit the Notice of
Termination (NOT)
Which of the following is 3. Flushing a spill down a storm drain.
NOT a beneficial use of
water?
1. Swimming
2. Drinking
3. Flushing a spill down a storm
drain
4. Industrial and agricultural
water supply
-c… 1/8
, 8/13/25, 1:26 AM Walmart SWPPP Exam Actual Exam | All Questions and Correct Answers | Graded A+ | Verified Answers | Just Released Flashcard…
When installing and 3. The low point (overflow) of the check dam is in the middle of
maintaining a check dam, the channel.
make sure:
1. Stormwater is directed
around the check dam
2. Void spaces are filled with
sediment
3. The low point (overflow)
of the check dam is in
the middle of the
channel
4. The high point of the check
dam is in the middle of the
channel
To reduce the possibility of 3. Install filter fabric under rock and similar materials
undercutting in channels, placed within the stormwater conveyance.
you should:
1. Stabilize diversions and
swales within 21- days of
construction
2. Add mulch and straw
3. Install filter fabric under
rock and similar materials
placed within the
stormwater conveyance
4. Never install a BMP in a
stormwater conveyance
The Good Housekeeping 4. Post Construction Stormwater Management Procedures
section of the SWPPP must
include all BUT which of the
following:
1. Hazardous Waste
Management and
Disposal Procedures
2. Solid Waste Management
and Disposal Procedures
3. Sanitary Waste
Management and