SWPPP Exam Actual Exam | All Questions and
Correct Answers | Graded A+ | Verified Answers | Just
Released
1. Its documents stormwater management
You should have a SWPPP
2. Demonstrates your intent to manage stormwater on your site
for your construction site
3. It is required by law
because (3 reasons)
A well constructed Site specific
SWPPP for your site
should be
The NO must be submitted Prior to you commencing construction
One necessary component A schedule of activities
of a good SWPPP is
Factors that may impact the Weather and climate
SWPPP scheduling
activities include
1. petroleum storage tanks
Pollutant sources on a
2. Masonry material
construction site may
3. soil amendment
include (3)
The following considerations Endangered species and historical preservation
may be incorporatedd
into SWPPP
If you beileve BMP Seek written approval of the project SWPPP designer and project
modifications are owner
necessary onsite you
must,
1. Erosion and sediment control bet management practices
The SWPPP will contain the 2. A site specific sequence of construction activiites
following (3) 3. site maps
Once a site has experienced a Deficit and fialed BMP's and repair
rain event of measurable
… 1/7
, 8/13/25, 12:29 AM SWPPP Exam Actual Exam | All Questions and Correct Answers | Graded A+ | Verified Answers | Just Released
quantity you must identify
The document that contains The permit authorization letter
the permit number is
The portion of the the SWPPP The table of contents
that specifies the content of
the SWPPP is
The document in the The SWPPP certification letter
SWPPP that certifies the
GC's commitment to
compliance with the
SWPPP
The certifactions letter that The subcontractors certification form
identifies the name and
contact information of
subcontractors on the site is
The documents that reveal the The site maps
total area of disturbance are
The document completed The inspection report form
by the project SWPPP
inspector recording site
conditions during the
inspection is
The document that must be The spill report form
completed to report
hazardous spill on site is
The document that verifies The weekly meeting form
that weekly management
meetings have been
conducted is
The document delegating The delegation letter
responsibility of
inspections to another is
The document that must be The NOT
completed when final
stabilization is complete is
Scheduling Aids in protecting the site by timing construction activities