answers
When |does |the |CGP |apply? |- |correct |answersAny |construction |or |demolition |of |one |acre |or |
more
Activities |under |the |CGP |include: |
a. |Routine |maintenance |to |maintain |original |line |and |grade, |hydraulic |capacity, |or |original |
purpose |of |the |facility.
b. |Disturbances |to |land |surfaces |solely |related |to |agricultural |operations.
c. |Clearing |and |grading |2 |acres |of |land
d. |Discharges |of |storm |water |from |areas |on |tribal |lands. |- |correct |answersC
TRUE |OR |FALSE: |if |construction |of |an |LUP |will |occur |across |several |properties, |the |utility |
company, |municipality, |or |other |public/private |company/agency |that |owns |or |operates |the |
LUP |project |is |responsible |for |obtaining |coverage |- |correct |answersTrue
Risk |Level |2 |monitoring |requirements |include:
a. |Effluent |sampling |where |applicable
b. |Sampling |for |pH |and |turbidity
c. |Sampling |for |pH, |turbidity, |and |suspended |sediments |- |correct |answersB
All |NAL |data |must |be |uploaded |within |___ |after |NAL |exceedance |has |been |identified
a. |24 |hours
b. |1 |week
c. |10 |days
d. |2 |weeks |- |correct |answersC
, Who |must |file |Permit |Registration |Documents |(PRDs) |prior |to |the |commencement |of |
construction |activity?
a. |Qualified |SWPPP |Developer |(QSD)
b. |Legally |Responsible |Person |(LRP) |or |the |LRP's |Approved |Signatory
c. |Qualified |SWPPP |Practitioner |(QSP)
d. |The |CEO |- |correct |answersB
Which |regulation |establishes |a |framework |for |regulating |municipal |and |industrial |storm |water |
discharges |to |waters |of |the |United |States:
a. |Clean |Water |Act |(CWA)
b. |Porter-Cologne |Water |Quality |Control |Act
c. |Endangered |Species |Act
d. |U.S. |Environmental |Protection |Agency |(USEPA)
e. |California |Environmental |Quality |Act |(CEQA) |- |correct |answersA
Certain |non-storm |water |discharges |may |be |necessary |for |the |completion |of |construction |
projects. |Therefore |the |General |Permit |authorizes |such |discharges |provided |they |meet |the |
following |conditions |except: |
a. |Meet |the |NALs |for |pH |and |turbidity
b. |Not |cause |or |contribute |to |a |violation |of |water |quality |standards
c. |Comply |with |BMPs |as |described |in |the |SWPPP
d. |Be |infeasible |to |eliminate
e. |Causes |or |threatens |to |cause |pollution, |contamination, |or |nuisance |- |correct |answersE
When |possible, |use |erosion |controls |as |the |___ |protection, |with |sediment |controls |as |a |
___system.
a. |primary, |secondary