100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

FDOT BATCH PLANT OPERATOR'S QUIZ

Rating
-
Sold
-
Pages
3
Grade
A+
Uploaded on
07-08-2025
Written in
2025/2026

Hot weather concrete's maximum temperature is: - answer -100 degrees f Concrete quality control records are required to be: - answer -at each certified dot plant and maintained for 3 years Aggregate gradations are: - answer -required once per month per material How many mixing revolutions are required at the plant? - answer -70-100 Water-cement ratio (w/c ratio) is? - answer -water divided by cement, fly ash, and slag What is the unit weight of water? - answer -62.4 pounds

Show more Read less
Institution
FDOT
Course
FDOT








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
FDOT
Course
FDOT

Document information

Uploaded on
August 7, 2025
Number of pages
3
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

FDOT BATCH PLANT OPERATOR'S QUIZ
Absolute volume of a material is: - answer -volume of a material in a voidless state

The three methods which may be used to determine free moisture are: - answer -
cookout, towel dry, and probe

Plant personnel must inspect mixer trucks for what 5 items? - answer -counter, water,
rating plate, drum, and blades

The six types of cement allowed in fdot concrete mixes are? - answer -1, 2, 3, 1-p, 1-s,
1-p(ms)

Hot weather concrete's maximum temperature is: - answer -100 degrees f

Concrete quality control records are required to be: - answer -at each certified dot plant
and maintained for 3 years

Aggregate gradations are: - answer -required once per month per material

How many mixing revolutions are required at the plant? - answer -70-100

Water-cement ratio (w/c ratio) is? - answer -water divided by cement, fly ash, and slag

What is the unit weight of water? - answer -62.4 pounds

The minumum number of step checks required by scales is? - answer -at least 4

Why should care be exercised when handling aggregates? - answer -to prevent
segregation, degredation, and contamination

Excessive build up of hardened concrete in a mixer drum causes: - answer -inadequate
mixing

Aggregate from source a has a specific gravity of 2.63, while source b has a sg of 2.48.
Which source weighs the most per cubic foot of concrete? - answer -source a

Course aggregate stock piles must be sprinkled with water for at least
________________hours prior to batching fdot concrete? - answer -24 hours

Agitating speed of a truck mixer is: - answer -2 - 6 rpm


When 2 portland cements are ground differently, one finer than the other, the finer one
will: - answer -generate more heat, set more quickly, and give generally higher early
strength.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA YALA UNIVERSITY
View profile
Follow You need to be logged in order to follow users or courses
Sold
2013
Member since
3 year
Number of followers
1447
Documents
48584
Last sold
14 hours ago

3.8

345 reviews

5
172
4
61
3
44
2
16
1
52

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions